What is Developing? Open the mapMap

Forest land use approvedRoads & highways · Fazilka, Punjab

Four Laning of Abohar (Design Ch. 75.500, Existing Ch. Km. 49+070 of NH-07) to Fazilka (Design Ch. 114.080, Existing Ch. Km. 80+655 of SH-20) and Construction of 4-lane Greenfield highway of Abohar bypass (From design Ch. 0.000, Existing Ch. Km 58+230, Malout – Abohar Road on NH-07 to Design Ch. 6.380, Existing Ch. Km 42+305, Abohar - Fazilka Road on NH-07) (Total design length= 44.960 km) on HAM Mode in the state of Punjab under Bharatmala Pariyojana

Four Laning of Abohar (Design Ch. 75.500, Existing Ch. Km. 49+070 of NH-07) to Fazilka (Design Ch. 114.080, Existing Ch. Km. 80+655 of SH-20) and Construction of 4-lane Greenfield highway of Abohar bypass (From design Ch. 0.000, Existing Ch. Km 58+230, Malout – Abohar Road on NH-07 to Design Ch. 6.380, Existing Ch. Km 42+305, Abohar - Fazilka Road on NH-07) (Total design length= 44.960 km) on HAM Mode in the state of Punjab under Bharatmala Pariyojana is an approved road project in Alamgarh (109), Abohar, Fazilka, Punjab. The site covers 1,312.8 acres. Its stated project cost is ₹929.2 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 10 Sept 2025).

See it on the live map All projects in Fazilka

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Four Laning of Abohar (Design Ch. 75.500, Existing Ch. Km. 49+070 of NH-07) to Fazilka (Design Ch. 114.080, Existing Ch. Km. 80+655 of SH-20) and Construction of 4-lane Greenfield highway of Abohar bypass (From design Ch. 0.000, Existing Ch. Km 58+230, Malout – Abohar Road on NH-07 to Design Ch. 6.380, Existing Ch. Km 42+305, Abohar - Fazilka Road on NH-07) (Total design length= 44.960 km) on HAM Mode in the state of Punjab under Bharatmala Pariyojana is an approved road project in Alamgarh (109), Abohar, Fazilka, Punjab. The site covers 1,312.8 acres.

Who is building it?

The applicant is Piu Bathinda NHAI.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 10 Sept 2025), as of 27 Nov 2026.

Where is it?

In Alamgarh (109), Abohar, Fazilka, Punjab.

How big is it?

It has a stated cost of ₹929.2 crore; a site of 1,312.8 acres and 155.9 acres (63.1 ha) of forest land.

When was it filed?

The application was filed on 3 Jul 2024.

Project details

StatusForest land use approved
Status since10 Sept 2025
Application filed3 Jul 2024
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantPiu Bathinda NHAI
Land area1,312.8 acres (531.3 ha)
Forest land155.9 acres (63.1 ha)
Project cost₹929.2 crore
Village / localityAlamgarh (109)
Taluk / tehsilAbohar
DistrictFazilka
StatePunjab
Location fromSite boundary on record
Our referenceWID-PB-02805

In context

21 applications in Fazilka since January 2022 are in the same category (Roads & highways): 4 approved, 4 filed or under review, and 12 withdrawn, lapsed or rejected. At 1,312.8 acres, this one is larger than 95% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Alamgarh (109), Abohar, Fazilka, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Piu Bathinda NHAI projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.