Quick answers
What is this project?
Proposed Bore to be Installed By Gurmit Singh Cheema S/o Sh. Partap Singh at Left Side of Southern Canal Between Rd. 66-67, Village Khui Khera, Tehsil & Dist:- Fazilka is a rejected building project in Khui Khera (241), Fazilka, Punjab. The site covers 0 acres.
Who is building it?
The applicant is Gurmit Singh Cheema.
Has it been approved?
No. The application was rejected on 3 Aug 2026.
Where is it?
In Khui Khera (241), Fazilka, Punjab.
How big is it?
It has a stated cost of ₹2 lakh; a site of 0 acres and 110 m² of forest land.
When was it filed?
The application was filed on 18 May 2026.
Project details
| Status | Not approved |
|---|---|
| Status since | 3 Aug 2026 |
| Application filed | 18 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Gurmit Singh Cheema |
| Land area | 100 m² |
| Forest land | 110 m² |
| Project cost | ₹2 lakh |
| Village / locality | Khui Khera (241) |
| Taluk / tehsil | Fazilka |
| District | Fazilka |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03275 |
In context
22 applications in Fazilka since January 2022 are in the same category (Buildings & townships): 3 approved, 13 filed or under review, and 6 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khui Khera (241), Fazilka, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- : Diversion of 0.0188 Hect. Permission of forest land Cement Concrete Lining… — forest land use approved, 1.8 km away
- Diversion of 0.2268 hec.of forest land in favour of PSPCL for Construction of… — lapsed, 2.4 km away
- Four Laning of Abohar (Design Ch. 75.500, Existing Ch. Km. 49+070 of NH-07) to… — forest land use approved, 5.8 km away
- Diversion of 0.10974 Ha. of Forest Land for Project of Concrete Lining of (i)… — forest land use approved, 6.3 km away
- Proposed Installation-40/60 MW Solar Power Plant AARTI INTERNATIONAL LIMITED… — initial checks, 6.4 km away
- Widening and Upgradation From 2 Lane Ps to 4 Lane Ps in Km 17.600 to 21.350 of… — more information requested, 6.5 km away
- Diversion of 0.0256 Hect Permission of forest land Cement Concrete Lining of… — lapsed, 6.7 km away
- Diversion of 0.0236 Hect Permission of forest land Cement Concrete Lining of… — lapsed, 6.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.