Quick answers
What is this project?
Approach road to M/s Laut Bio Energy (Proposed Pallet Manufacturing Industry) is a lapsed road project in Dittupur, Nabha, Patiala, Punjab. The site covers 1.5 acres.
Who is building it?
The applicant is Laut Bio Energy.
Has it been approved?
No. The application was lapsed on 20 Aug 2026, so it is no longer under consideration.
Where is it?
In Dittupur, Nabha, Patiala, Punjab.
How big is it?
It has a stated cost of ₹5 lakh; a site of 1.5 acres and 460 m² of forest land.
When was it filed?
The application was filed on 17 Jul 2026.
Project details
| Official title | Approach road to M/s Laut Bio Energy (Proposed Pallet Manufacturing Industry) situated at Village Laut on Patiala to Bhadson Road Km. 16.852 (RHS), Tehsil Nabha, under Forest Division & Distt. Patiala, Punjab |
|---|---|
| Status | Lapsed |
| Status since | 20 Aug 2026 |
| Application filed | 17 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Laut Bio Energy |
| Land area | 1.5 acres (0.6 ha) |
| Forest land | 460 m² |
| Project cost | ₹5 lakh |
| Village / locality | Dittupur |
| Taluk / tehsil | Nabha |
| District | Patiala |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02836 |
In context
68 applications in Patiala since January 2022 are in the same category (Roads & highways): 24 approved, 13 filed or under review, and 31 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 1.5 acres, this one is smaller than 54% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dittupur, Nabha, Patiala, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/S Laut Bio Energy — initial checks, 0 m away
- M/s Laut Bio Energy (Proposed Pallet Manufacturing Industry) — more information requested, 0 m away
- Sukhchain Singh Son of SH Amrik Singh Sole Owner of Proposed Industrial Project — forest land use approved, 1.8 km away
- Permission of forest land construction of approach access to GOODWILL… — forest land use approved, 4.2 km away
- Permission for construction of approach Access to M/S Velocity Feed Industries — forest land use approved, 6.1 km away
- Permission of forest land for construction of approach Access Retail Outlet of… — forest land use approved, 6.5 km away
- Laying of 125mm MDPE & 6" Dia Steel Gas Pipeline by Torrent Gas Limited on… — lapsed, 6.9 km away
- Persmission of forest land for construction of approach Access to KARTAR AGRO… — forest land use approved, 7.4 km away
More from Laut Bio Energy in Patiala
- Industrial project by M/S Laut Bio Energy — initial checks
- M/s Laut Bio Energy (Proposed Pallet Manufacturing Industry) — more information requested
All 3 Laut Bio Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.