Quick answers
What is Industrial project by M/S Laut Bio Energy?
This proposed industrial project by M/S Laut Bio Energy is in Laot, Nabha, Patiala, Punjab. The site covers 1 acre.
Who is building it?
The applicant is Laut Bio Energy.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Laot, Nabha, Patiala, Punjab.
How big is it?
It has a stated cost of ₹5 lakh; a site of 1 acre and 40 m² of forest land.
When was it filed?
The application was filed on 25 Nov 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 26 Nov 2026 |
| Application filed | 25 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Industry |
| Applicant | Laut Bio Energy |
| Land area | 1 acres (0.4 ha) |
| Forest land | 40 m² |
| Project cost | ₹5 lakh |
| Village / locality | Laot |
| Taluk / tehsil | Nabha |
| District | Patiala |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02913 |
In context
45 applications in Patiala since January 2022 are in the same category (Industry): 29 approved, 6 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1 acre, this one is smaller than 87% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Laot, Nabha, Patiala, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s Laut Bio Energy (Proposed Pallet Manufacturing Industry) — more information requested, 0 m away
- Approach road to M/s Laut Bio Energy (Proposed Pallet Manufacturing Industry) — lapsed, 0 m away
- Sukhchain Singh Son of SH Amrik Singh Sole Owner of Proposed Industrial Project — forest land use approved, 1.8 km away
- Permission of forest land construction of approach access to GOODWILL… — forest land use approved, 4.2 km away
- Permission for construction of approach Access to M/S Velocity Feed Industries — forest land use approved, 6.1 km away
- Permission of forest land for construction of approach Access Retail Outlet of… — forest land use approved, 6.5 km away
- Laying of 125mm MDPE & 6" Dia Steel Gas Pipeline by Torrent Gas Limited on… — lapsed, 6.9 km away
- Persmission of forest land for construction of approach Access to KARTAR AGRO… — forest land use approved, 7.4 km away
More from Laut Bio Energy in Patiala
- M/s Laut Bio Energy (Proposed Pallet Manufacturing Industry) — more information requested
- Approach road to M/s Laut Bio Energy (Proposed Pallet Manufacturing Industry) — lapsed
All 3 Laut Bio Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.