Quick answers
What is this project?
Desilting in Longitudinal Length Opposite Shergarh and Dhulewal Complex Rd 55000-70000 of 3 L Bandh to Guide the Flow of River Sutlej is a lapsed project in Auliapur, Balachaur, Shahid Bhagat Singh Nagar, Punjab. The site covers 4.5 acres.
Who is building it?
The applicant is Executive Engineer Cum District Mining Officer Ludhiana.
Has it been approved?
No. The application was lapsed on 16 Apr 2026, so it is no longer under consideration.
Where is it?
In Auliapur, Balachaur, Shahid Bhagat Singh Nagar, Punjab.
How big is it?
It has a stated cost of ₹3.7 crore; a site of 4.5 acres and 4.5 acres (1.8 ha) of forest land.
When was it filed?
The application was filed on 16 Mar 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 16 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Executive Engineer Cum District Mining Officer Ludhiana |
| Land area | 4.5 acres (1.8 ha) |
| Forest land | 4.5 acres (1.8 ha) |
| Project cost | ₹3.7 crore |
| Village / locality | Auliapur |
| Taluk / tehsil | Balachaur |
| District | Shahid Bhagat Singh Nagar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03032 |
In context
6 applications in Shahid Bhagat Singh Nagar since January 2022 are in the same category (Other): 0 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Auliapur, Balachaur, Shahid Bhagat Singh Nagar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand mining project, Village- Auliapur District- SBS Nagar State… — lapsed, 350 m away
- Proposed Sand mining project, Village- Auliapur District- SBS Nagar State… — cleared for impact study, 350 m away
- Proposed Sand Mining Project (site no. PO_SN_BL_ST_22) on the Sutlej riverbed — more information requested, 900 m away
- Proposed Sand Mining Project (site no. PO_SN_BL_ST_22) on the Sutlej riverbed — cleared for impact study, 900 m away
- Proposed Sand Mining (boulder, gravel, sand) project (site no. PO_SN_BL_ST_22)… — lapsed, 900 m away
- Proposed sand mining project (Boulder, gravel, sand) as per DSR NO.… — environmental approval granted, 1.3 km away
- Desilting of River Sutlej — lapsed, 2.3 km away
- Desilting of River Sutlej — lapsed, 2.3 km away
All 43 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.