Quick answers
What is this project?
Proposed Sand Mining Project (site no. PO_SN_BL_ST_22) on the Sutlej riverbed is a proposed mining project in Auliapur, Balachaur, Shahid Bhagat Singh Nagar, Punjab. The site covers 3.2 acres.
Who is building it?
The applicant is Executive Engineer-Cum- District Mining Officer.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 16 Jun 2026), as of 27 Nov 2026.
Where is it?
In Auliapur, Balachaur, Shahid Bhagat Singh Nagar, Punjab.
How big is it?
It has a stated cost of ₹49 lakh and a site of 3.2 acres.
When was it filed?
The application was filed on 17 Apr 2026.
Project details
| Official title | Proposed Sand Mining Project (site no. PO_SN_BL_ST_22) on the Sutlej riverbed located at Village- Auliapur-1, Tehsil- Balachaur, District-SBS Nagar, Punjab through Executive Engineer/SBS Nagar, Drainage cum Mines and Geology WRD Punjab |
|---|---|
| Status | Cleared for impact study |
| Status since | 16 Jun 2026 |
| Application filed | 17 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Executive Engineer-Cum- District Mining Officer |
| Land area | 3.2 acres (1.3 ha) |
| Project cost | ₹49 lakh |
| Village / locality | Auliapur |
| Taluk / tehsil | Balachaur |
| District | Shahid Bhagat Singh Nagar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01129 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Jul 2026 | More information requested | 3.2 acres | ₹49 lakh |
| Early planning filed 17 Apr 2026 (this page) | Cleared for impact study | 3.2 acres | ₹49 lakh |
In context
48 applications in Shahid Bhagat Singh Nagar since January 2022 are in the same category (Mining): 30 approved, 7 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 3.2 acres, this one is smaller than 92% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Auliapur, Balachaur, Shahid Bhagat Singh Nagar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project (site no. PO_SN_BL_ST_22) on the Sutlej riverbed — more information requested, 0 m away
- Proposed Sand Mining (boulder, gravel, sand) project (site no. PO_SN_BL_ST_22)… — lapsed, 0 m away
- Proposed Sand mining project, Village- Auliapur District- SBS Nagar State… — lapsed, 550 m away
- Proposed Sand mining project, Village- Auliapur District- SBS Nagar State… — cleared for impact study, 550 m away
- Desilting in Longitudinal Length Opposite Shergarh and Dhulewal Complex Rd… — lapsed, 900 m away
- Desilting of River Sutlej — lapsed, 1.6 km away
- Desilting of River Sutlej — lapsed, 1.6 km away
- Desilting of River Sutlej — lapsed, 1.6 km away
More from Executive Engineer-Cum- District Mining Officer in Shahid Bhagat Singh Nagar
- Proposed Sand Mining (boulder, gravel, sand) project (site no… — more information requested
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_69) — lapsed
- Sand Mining, Minor Mineral of Village Laalewal, Khoja, Tehsil Nawashehar,… — lapsed
- Sand Mining, Minor Mineral of Village Laalewal, Khoja, Tehsil Nawashehar,… — cleared for impact study
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_69) — cleared for impact study
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_70) — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.