Quick answers
What is Marriage Palace of M/S United Resort?
Marriage Palace of M/S United Resort is a lapsed road project in Halwara, Raikot, Ludhiana, Punjab. The site covers 4.9 acres.
Who is building it?
The applicant is United Resort.
Has it been approved?
No. The application was lapsed on 24 Sept 2026, so it is no longer under consideration.
Where is it?
In Halwara, Raikot, Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹5 crore; a site of 4.9 acres and 180 m² of forest land.
When was it filed?
The application was filed on 18 Feb 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Sept 2026 |
| Application filed | 18 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | United Resort |
| Land area | 4.9 acres (2 ha) |
| Forest land | 180 m² |
| Project cost | ₹5 crore |
| Village / locality | Halwara |
| Taluk / tehsil | Raikot |
| District | Ludhiana |
| State | Punjab |
| Location from | Site area on record |
| Our reference | WID-PB-03162 |
In context
140 applications in Ludhiana since January 2022 are in the same category (Roads & highways): 44 approved, 52 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 4.9 acres, this one is larger than 61% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Halwara, Raikot, Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Development of New Integrated Civil Enclave at Halwara Airport — environmental approval granted, 4.5 km away
- Proposed Resin & Glue manufacturing plant of capacity 100 TPD by M/s Sterling… — environmental approval granted, 8.9 km away
- Proposed Resin & Glue manufacturing plant of capacity 100 TPD by M/s Sterling… — cleared for impact study, 8.9 km away
- Proposed manufacturing unit for production of Formaldehyde and Resin by M/s… — under environmental review, 9 km away
- Expansion in existing unit namely "M/s Vivachem Intermediates (P) Limited"… — initial checks, 9.1 km away
- Expansion in existing unit namely "M/s Vivachem Intermediates (P) Limited"… — cleared for impact study, 9.1 km away
- Road project by M/S Motel Nagpal Regency Pvt. Ltd., at Village Boparai Kalan,… — lapsed, 9.6 km away
- The Grand Mansion Wedding Resort — more information requested, 10.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.