Quick answers
What is Approach Road to retail outlet of NAYARA ENERGY LIMITED?
Approach Road to retail outlet of NAYARA ENERGY LIMITED is a lapsed fuel station in Lisara, Phillaur, Jalandhar, Punjab. The site covers 0.6 acres.
Who is building it?
The applicant is Nayara Energy Limited.
Has it been approved?
No. The application was lapsed on 21 Mar 2026, so it is no longer under consideration.
Where is it?
In Lisara, Phillaur, Jalandhar, Punjab.
How big is it?
It has a stated cost of ₹80 lakh; a site of 0.6 acres and 780 m² of forest land.
When was it filed?
The application was filed on 17 Feb 2026.
Project details
| Official title | Approach Road to retail outlet of NAYARA ENERGY LIMITED at Village Lasara on Phillaur-Rahon Road, JODR-04 at RD KM. 014.173-014.209 (LHS) Tehsil Phillaur, Distt Jalandhar, under Forest Division Jalandhar, Punjab. |
|---|---|
| Status | Lapsed |
| Status since | 21 Mar 2026 |
| Application filed | 17 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Nayara Energy Limited |
| Land area | 2,400 m² |
| Forest land | 780 m² |
| Project cost | ₹80 lakh |
| Village / locality | Lisara |
| Taluk / tehsil | Phillaur |
| District | Jalandhar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03176 |
In context
21 applications in Jalandhar since January 2022 are in the same category (Fuel stations): 10 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 0.6 acres, this one is smaller than 62% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lisara, Phillaur, Jalandhar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Reliance BP Mobility Limited Village- Sailkiana Distt – Jalandhar — initial checks, 2.3 km away
- Kadiana Sand Mining Project by Executive Engineer/Jalandhar,… — environmental approval granted, 4.7 km away
- Proposed Minor Mineral (Sand) Mining Project for obtaining Terms of Reference… — lapsed, 5.5 km away
- Diversion of 0.3417 ha. of Forest land for laying of optical fibre cable by… — forest land use approved, 9.2 km away
- Proposed Sand Mining Project ( Boulder, Gravel, Sand) As Per Dsr No.… — more information requested, 10.5 km away
- Proposed Sand Mining Project ( Boulder, Gravel, Sand) As Per Dsr No.… — cleared for impact study, 10.5 km away
- Mining of Minor Minerals (Sand) from the river bed of River Sutlej having… — under environmental review, 10.9 km away
- Mining of Minor Minerals (Sand) from the river bed of River Sutlej having… — cleared for impact study, 10.9 km away
All 61 Nayara Energy projects across India