Quick answers
What is Metro Resort?
Metro Resort is a lapsed road project in Saidpura, Fatehgarh Sahib, Punjab. The site covers 1.6 acres.
Who is building it?
The applicant is METRO rESORT.
Has it been approved?
No. The application was lapsed on 9 Jan 2026, so it is no longer under consideration.
Where is it?
In Saidpura, Fatehgarh Sahib, Punjab.
How big is it?
It has a stated cost of ₹2.5 crore; a site of 1.6 acres and 640 m² of forest land.
When was it filed?
The application was filed on 7 Dec 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Jan 2026 |
| Application filed | 7 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | METRO rESORT |
| Land area | 1.6 acres (0.7 ha) |
| Forest land | 640 m² |
| Project cost | ₹2.5 crore |
| Village / locality | Saidpura |
| Taluk / tehsil | Fatehgarh Sahib |
| District | Fatehgarh Sahib |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03443 |
In context
18 applications in Fatehgarh Sahib since January 2022 are in the same category (Roads & highways): 7 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 1.6 acres, this one is smaller than 53% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Saidpura, Fatehgarh Sahib, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Permission for construction of Over Bridge on Narwana Branch Canal (N.B.C) RD… — lapsed, 1.7 km away
- Permission for diversion of Forest Land for construction of Entry & Exit… — forest land use approved, 2.1 km away
- Permission for diversion of Forest Land for construction of Entry & Exit… — lapsed, 2.1 km away
- Permission for construction of approach Access to Proposed The J. KHAROUD ( A… — more information requested, 2.6 km away
- Permission for construction of approach Access to Proposed Industrial Flour… — forest land use approved, 3.3 km away
- Approach road for proposed Retail outlet by BPCL — forest land use approved, 3.7 km away
- Diversion of 0.34 Ha of forest land permission for construction of Railway… — forest land use approved, 4.1 km away
- Permission for construction of approach Access to Commercial Colony Project… — more information requested, 4.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.