Quick answers
What is this project?
Permission for construction of approach Access to Proposed Industrial Flour Mill (Atta Chakki) of "M/S Aarav Agro Food Industry" through Mr. Rajan Thukral ( Proprietor) at Jalbehri Gehlan on Sadhugarh-Badali link road Km 2-3 L/S Tehsil & Distt: Fatehgarh Sahib is an approved road project in Jalberi Gahla, Fatehgarh Sahib, Punjab. The site covers 3.4 acres.
Who is building it?
The applicant is Rajan Thukral.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 6 Oct 2026), as of 27 Nov 2026.
Where is it?
In Jalberi Gahla, Fatehgarh Sahib, Punjab.
How big is it?
It has a stated cost of ₹2 crore; a site of 3.4 acres and 270 m² of forest land.
When was it filed?
The application was filed on 14 Apr 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 6 Oct 2026 |
| Application filed | 14 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Rajan Thukral |
| Land area | 3.4 acres (1.4 ha) |
| Forest land | 270 m² |
| Project cost | ₹2 crore |
| Village / locality | Jalberi Gahla |
| Taluk / tehsil | Fatehgarh Sahib |
| District | Fatehgarh Sahib |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02664 |
In context
18 applications in Fatehgarh Sahib since January 2022 are in the same category (Roads & highways): 7 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 3.4 acres, this one is larger than 65% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jalberi Gahla, Fatehgarh Sahib, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Permission for diversion of Forest Land for construction of Entry & Exit… — forest land use approved, 2.4 km away
- Permission for diversion of Forest Land for construction of Entry & Exit… — lapsed, 2.4 km away
- Approach road for proposed Retail outlet by BPCL — forest land use approved, 2.6 km away
- Metro Resort — lapsed, 3.3 km away
- Permission for construction of Over Bridge on Narwana Branch Canal (N.B.C) RD… — lapsed, 3.5 km away
- Permission for construction of approach Access to Proposed The J. KHAROUD ( A… — more information requested, 5.6 km away
- Dolphin Industrial Park (Agro-Based) by M/s Dolphin Mercantile Pvt. Ltd — environmental approval granted, 5.8 km away
- Diversion of 0.34 Ha of forest land permission for construction of Railway… — forest land use approved, 6.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.