Quick answers
What is this project?
Permission for construction of approach Access Retail Outlet Of Indian Oil Corporation Limited is an approved fuel station in Chhanna (Bahadurpur Fakiran), Patiala, Punjab. The site covers 0.5 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 18 Jul 2025), as of 27 Nov 2026.
Where is it?
In Chhanna (Bahadurpur Fakiran), Patiala, Punjab.
How big is it?
It has a stated cost of ₹1 crore; a site of 0.5 acres and 280 m² of forest land.
When was it filed?
The application was filed on 30 Apr 2025.
Project details
| Official title | Permission for construction of approach Access Retail Outlet Of Indian Oil Corporation Limited at Vill: Bahadarpur Fakiran Tehsil: Dudhan Sadhan & Distt: Patiala. |
|---|---|
| Status | Forest land use approved |
| Status since | 18 Jul 2025 |
| Application filed | 30 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 1,900 m² |
| Forest land | 280 m² |
| Project cost | ₹1 crore |
| Village / locality | Chhanna (Bahadurpur Fakiran) |
| Taluk / tehsil | Patiala |
| District | Patiala |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03445 |
In context
37 applications in Patiala since January 2022 are in the same category (Fuel stations): 27 approved, 3 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.5 acres, this one is smaller than 70% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chhanna (Bahadurpur Fakiran), Patiala, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Godown building of M/S Shiv Godown — in-principle approval, conditions pending, 1.9 km away
- Diversion of 3.822 Ha of forest land permission for Upgradation of… — lapsed, 2.7 km away
- Construction of Aqueduct at RD 71000 of Arnauli Distributory Detail — under wildlife review, 8.8 km away
- Permission for construction of approach Access Retail Outlet Of Bharat… — forest land use approved, 9.3 km away
- Permission for construction of approach Access Retail Outlet Of Bharat… — in-principle approval, conditions pending, 12.1 km away
- Permission for construction of approach Access Retail Outlet Of Bharat… — forest land use approved, 12.1 km away
- Diversion of 0.0030 Hec. Forest Land Permission for Laying Underground… — more information requested, 12.3 km away
- Diversion of 0.0136 Hac Forest Land Permission for Laying Underground Pipeline… — under forest review, 12.4 km away
More from Indian Oil Corporation Limited (IOCL) in Patiala
- Fuel station by M/S Indian Oil Corporation Limited — lapsed
- Permission for construction of approach Access Retail Outlet Of Indian Oil… — forest land use approved
- Permission for construction of approach Access Retail Outlet Of Indian Oil… — forest land use approved
- Permission for construction of approach Access Retail Outlet Of Indian Oil… — forest land use approved
- Fuel station by M/S Indian Oil Corporation Limited — forest land use approved
- Fuel station by Indian Oil Corporation Limited — lapsed
9 Indian Oil Corporation (IOCL) projects in Patiala
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.