What is Developing? Open the mapMap

Forest land use approvedWater & irrigation · Ludhiana, Punjab

Diversion of 1.24 Ha (i.e 1.24 Ha Protected forest) of forest land in favour of Executive Engineer , Ropar Canal & Ground Water Division, WRD Punjab, Ropar for Concrete Lining of Ballowal Minor within jurisdiction of Ludhiana Forest Division

Diversion of 1.24 Ha (i.e 1.24 Ha Protected forest) of forest land in favour of Executive Engineer , Ropar Canal & Ground Water Division, WRD Punjab, Ropar for Concrete Lining of Ballowal Minor within jurisdiction of Ludhiana Forest Division is an approved water and irrigation project in Dhaipai, Ludhiana (West), Ludhiana, Punjab. The site covers 7.3 acres. Its stated project cost is ₹1.7 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 20 Dec 2024).

See it on the live map All projects in Ludhiana

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 1.24 Ha (i.e 1.24 Ha Protected forest) of forest land in favour of Executive Engineer , Ropar Canal & Ground Water Division, WRD Punjab, Ropar for Concrete Lining of Ballowal Minor within jurisdiction of Ludhiana Forest Division is an approved water and irrigation project in Dhaipai, Ludhiana (West), Ludhiana, Punjab. The site covers 7.3 acres.

Who is building it?

The applicant is Executive Engineer Ropar Head Works Division Ropar.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 20 Dec 2024), as of 27 Nov 2026.

Where is it?

In Dhaipai, Ludhiana (West), Ludhiana, Punjab.

How big is it?

It has a stated cost of ₹1.7 crore; a site of 7.3 acres and 3.1 acres (1.2 ha) of forest land.

When was it filed?

The application was filed on 8 Oct 2023.

Project details

Official titleDiversion of 1.24 Ha (i.e 1.24 Ha Protected forest) of forest land in favour of Executive Engineer , Ropar Canal & Ground Water Division, WRD Punjab, Ropar for Concrete Lining of Ballowal Minor within jurisdiction of Ludhiana Forest Division in district Ludhiana Punjab
StatusForest land use approved
Status since20 Dec 2024
Application filed8 Oct 2023
Approval soughtForest land use
Application typeNew project
SectorWater & irrigation
ApplicantExecutive Engineer Ropar Head Works Division Ropar
Land area7.3 acres (3 ha)
Forest land3.1 acres (1.2 ha)
Project cost₹1.7 crore
Village / localityDhaipai
Taluk / tehsilLudhiana (West)
DistrictLudhiana
StatePunjab
Location fromSite boundary on record
Our referenceWID-PB-03464

In context

13 applications in Ludhiana since January 2022 are in the same category (Water & irrigation): 5 approved, 1 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval. At 7.3 acres, this one is larger than 67% of them.

Where it is

Dhaipai, Ludhiana (West), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.