Project details
| Official title | Desilting of Beas River in Village Haler Janardan, Tehsil Mukeria Distt Hoshiarpur |
|---|---|
| Status | Under wildlife review |
| Status since | 4 Nov 2026 |
| Application filed | 4 May 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Executive Engineer Drainage Cum District Mining Officer Hoshiarpur |
| Land area | 15.7 acres (6.4 ha) |
| Project cost | ₹3.8 crore |
| Village / locality | Haler |
| Taluk / tehsil | Mukerian |
| District | Hoshiarpur |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03658 |
In context
35 applications in Hoshiarpur since January 2022 are in the same category (Buildings & townships): 6 approved, 20 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 15.7 acres, this one is larger than 57% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Haler, Mukerian, Hoshiarpur, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Desilting of Beas River — under wildlife review, 2.7 km away
- Proposed MS/HSD Regular Outlet Dealership (Hindustan Petroleum Corporation… — lapsed, 3.2 km away
- Proposed Dhaba — forest land use approved, 8.2 km away
- Fuel station by MS/HSD Regular Retail Outlet Dealership (Indian Oil… — lapsed, 8.4 km away
- Northern Railway For the Construction of Railway Line Including Triangle… — lapsed, 8.6 km away
- Approach road to retail outlet of Reliance BP Mobility Ltd — forest land use approved, 9.8 km away
- Drain in front of retail outlet of Reliance BP Mobility Ltd — forest land use approved, 9.8 km away
- Desilting of Beas River — more information requested, 9.9 km away
More from Executive Engineer Drainage Cum District Mining Officer Hoshiarpur in Hoshiarpur
- Desilting of Restoring water capacity by clearing Syphon Aqueduct at RD ± 200… — lapsed
- Desilting of Beas River — under wildlife review
- Desilting of Beas River — more information requested
- Desilting of Beas River — more information requested
- Desilting of Beas River — more information requested
- Desilting of Beas River — more information requested
22 Executive Engineer Drainage Cum District Mining Officer Hoshiarpur, Punjab projects in Hoshiarpur
All 24 Executive Engineer Drainage Cum District Mining Officer Hoshiarpur, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.