One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Synthetic Resin (Phenolic Resin- 15000 MT/yr) manufacturing plant located at…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Nov 2022 |
| Application filed | 24 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Yojna Raghav |
| Land area | 3,300 m² |
| Project cost | ₹12.3 crore |
| Village / locality | Naharpur |
| Taluk / tehsil | Alwar |
| District | Alwar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-00077 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 May 2023 | Environmental approval granted | 0.8 acres | ₹12.3 crore |
| Early planning filed 24 Nov 2022 (this page) | Cleared for impact study | 0.8 acres | ₹12.3 crore |
In context
127 applications in Alwar since January 2022 are in the same category (Industry): 93 approved, 18 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.8 acres, this one is smaller than 72% of them.
27 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Naharpur, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Synthetic Resin (Phenolic Resin- 15000 MT/yr) manufacturing plant… — environmental approval granted, 0 m away
- Manufacturing Of Active Pharmaceutical Ingredients And Formulations Unit — lapsed, 50 m away
- Manufacturing Of Active Pharmaceutical Ingredients And Formulations Unit — cleared for impact study, 50 m away
- Expansion of Proposed Pharmaceutical Bulk Drug & Intermediates Unit — under environmental review, 350 m away
- Expansion of Proposed Pharmaceutical Bulk Drug & Intermediates Unit — cleared for impact study, 350 m away
- Expansion of Proposed Pharmaceutical Bulk Drug & Intermediates Unit — cleared for impact study, 350 m away
- Transfer of EC (Name Change Only) for the Project "M.S./ S.S. Billets, Flats,… — under environmental review, 550 m away
- Expansion of Organic Dyes Manufacturing Unit — environmental approval granted, 700 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.