Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 5 Dec 2023 |
| Application filed | 5 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Govind Formulation Private Limited |
| Land area | 1,000 m² |
| Project cost | ₹3 crore |
| Village / locality | Naharpur |
| Taluk / tehsil | Alwar |
| District | Alwar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-01767 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 May 2024 | Lapsed | 0.2 acres | ₹3 crore |
| Early planning filed 5 Dec 2023 (this page) | Cleared for impact study | 0.2 acres | ₹3 crore |
In context
127 applications in Alwar since January 2022 are in the same category (Industry): 93 approved, 18 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.2 acres, this one is smaller than 99% of them.
27 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Naharpur, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Manufacturing Of Active Pharmaceutical Ingredients And Formulations Unit — lapsed, 0 m away
- Proposed Synthetic Resin (Phenolic Resin- 15000 MT/yr) manufacturing plant… — environmental approval granted, 50 m away
- Proposed Synthetic Resin (Phenolic Resin- 15000 MT/yr) manufacturing plant… — cleared for impact study, 50 m away
- Expansion of Proposed Pharmaceutical Bulk Drug & Intermediates Unit — under environmental review, 400 m away
- Expansion of Proposed Pharmaceutical Bulk Drug & Intermediates Unit — cleared for impact study, 400 m away
- Expansion of Proposed Pharmaceutical Bulk Drug & Intermediates Unit — cleared for impact study, 400 m away
- Transfer of EC (Name Change Only) for the Project "M.S./ S.S. Billets, Flats,… — under environmental review, 500 m away
- Expansion of Organic Dyes Manufacturing Unit — environmental approval granted, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.