Quick answers
What is this project?
Proposed expansion of Gas Processing Complex (GPC) from 1 MMSCMD to 1.5 MMSCMD within the existing Dandewala (DND) block of 250 Sq.km is a proposed industrial project in Tanot, Jaisalmer, Rajasthan. The site covers 61,776.3 acres.
Who is building it?
The applicant is Oil India LTD Rajasthan Project.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 2 Nov 2022), as of 27 Nov 2026.
Where is it?
In Tanot, Jaisalmer, Rajasthan.
How big is it?
It has a stated cost of ₹172 crore and a site of 61,776.3 acres.
When was it filed?
The application was filed on 2 Nov 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion of Gas Processing Complex (GPC) from 1 MMSCMD to 1.5 MMSCMD within…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 2 Nov 2022 |
| Application filed | 2 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Oil India LTD Rajasthan Project |
| Land area | 61,776.3 acres (25,000 ha) |
| Project cost | ₹172 crore |
| Village / locality | Tanot |
| Taluk / tehsil | Jaisalmer |
| District | Jaisalmer |
| State | Rajasthan |
| Location from | Site area on record |
| Our reference | WID-RJ-00139 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 11 May 2026 | Environmental approval granted | 61,776.3 acres | ₹172 crore |
| Early planning filed 2 Nov 2022 (this page) | Cleared for impact study | 61,776.3 acres | ₹172 crore |
In context
9 applications in Jaisalmer since January 2022 are in the same category (Industry): 6 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected.
Where it is
Tanot, Jaisalmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of Gas Processing Complex (GPC) from 1 MMSCMD to 1.5 MMSCMD… — environmental approval granted, 0 m away
- Proposed Onshore Developmental drilling of 12 no. s of wells in… — cleared for impact study, 28.7 km away
- Drilling of 25 Nos. wells in 885.35 Sq. Km area of Jaiselmer Basin (comprises… — returned to applicant, 34.6 km away
- Ec for Oil and Gas Exploration & Appraisal for Drilling of 02 Exploratory… — lapsed, 34.6 km away
- Onshore Development and Production of Oil & Gas from 20 Wells in 4 ML… — cleared for impact study, 35.3 km away
- EC for Drilling of 01 Exploratory Well CWAC in south kharatar (Part A and Part… — lapsed, 48 km away
- Onshore Oil and Gas Exploration and Appraisal in RJ-ONHP-2018/1 block (417.44… — lapsed, 53.9 km away
- 400 kV S/C Overhead Transmission Line from proposed 400KV PSS of M/s Adani… — more information requested, 54.8 km away
3 Oil India (OIL) projects in Jaisalmer
All 97 Oil India (OIL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.