Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 13 Oct 2022 |
| Application filed | 13 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | M/S Sri Dwarika Dheesh Polymers PVT. LTD. |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹6.6 crore |
| Village / locality | Kamalpur |
| Taluk / tehsil | Ramgarh |
| District | Alwar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-00441 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 10 Aug 2023 | Environmental approval granted | 2 acres | ₹6.6 crore |
| Early planning filed 13 Oct 2022 (this page) | Cleared for impact study | 2 acres | ₹6.6 crore |
In context
127 applications in Alwar since January 2022 are in the same category (Industry): 93 approved, 18 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2 acres, this one is smaller than 61% of them.
27 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kamalpur, Ramgarh, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Synthetic Organic Chemical Manufacturing Industry — environmental approval granted, 0 m away
- Expansion of Proposed Pharmaceutical Bulk Drug & Intermediates Unit — under environmental review, 400 m away
- Expansion of Proposed Pharmaceutical Bulk Drug & Intermediates Unit — cleared for impact study, 400 m away
- Expansion of Proposed Pharmaceutical Bulk Drug & Intermediates Unit — cleared for impact study, 400 m away
- Amendment in Environment Clearance issued for Proposed Expansion of Caustic… — environmental approval granted, 400 m away
- Proposed Synthetic Resin (Phenolic Resin- 15000 MT/yr) manufacturing plant… — environmental approval granted, 700 m away
- Proposed Synthetic Resin (Phenolic Resin- 15000 MT/yr) manufacturing plant… — cleared for impact study, 700 m away
- Manufacturing Of Active Pharmaceutical Ingredients And Formulations Unit — lapsed, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.