Project details
| Official title | Thandiberi Limestone Mine (ML Area – 256.00 ha) With Expansion in Limestone Production Capacity from 1.065 Million TPA to 6.00 Million TPA, Waste (OB/IB) 1.14 million TPA and Mineral reject 0.46 Million TPA (Total Excavation 7.60 Million TPA) With proposed Crusher Capacity of 1700 TPH & Screening With Wobbler at Villages- Thandiberi and Sabela Tehsil- Pindwara, District-Sirohi, Rajasthan of M/s. UltraTech Nathdwara Cement Limited |
|---|---|
| Status | Cleared for impact study |
| Status since | 10 Jul 2023 |
| Application filed | 29 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ultratech Nathdwara Cement LTD. |
| Land area | 632.6 acres (256 ha) |
| Project cost | ₹256.5 crore |
| Village / locality | Thandiveri |
| Taluk / tehsil | Pindwara |
| District | Sirohi |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-00769 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 22 Jun 2024 | Environmental approval granted | 632.6 acres | ₹256.5 crore |
| Early planning filed 29 May 2023 (this page) | Cleared for impact study | 632.6 acres | ₹256.5 crore |
In context
511 applications in Sirohi since January 2022 are in the same category (Mining): 274 approved, 42 filed or under review, and 195 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 632.6 acres, this one is larger than 97% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Thandiveri, Pindwara, Sirohi, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regarding Transfer / Name Change in the EC granted for Thandiberi Limestone… — lapsed, 0 m away
- Thandiberi Limestone Mine (ML Area – 256.00 ha) With Expansion in Limestone… — environmental approval granted, 0 m away
- Regarding Transfer / Name Change in the Environment Clearance granted for… — lapsed, 2.9 km away
- Amli Limestone Mine (ML Area – 468.6875 Ha) With Expansion in Limestone… — environmental approval granted, 2.9 km away
- Amli Limestone Mine (ML Area – 468.6875 Ha) With Expansion in Limestone… — cleared for impact study, 2.9 km away
- Regarding Transfer / Name Change in the Environment Clearance granted for… — environmental approval granted, 5 km away
- Regarding the Transfer / Name Change in the Environment Clearance granted for… — environmental approval granted, 5.4 km away
- Expansion of Integrated Cement Plant [Clinker - 4.80 to 8.3 Million TPA;… — environmental approval granted, 5.4 km away
More from Ultratech Nathdwara Cement LTD. in Sirohi
- Amli Limestone Mine (ML Area – 468.6875 Ha) With Expansion in Limestone… — environmental approval granted
- Amli Limestone Mine (ML Area – 468.6875 Ha) With Expansion in Limestone… — cleared for impact study
- Expansion of Integrated Cement Plant [Clinker - 4.80 to 8.3 Million TPA;… — environmental approval granted
5 Ultratech Nathdwara Cement projects in Sirohi
All 6 Ultratech Nathdwara Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.