Project details
| Official title | Expansion of Integrated Cement Plant [Clinker - 4.80 to 8.3 Million TPA; Cement - 4.85 to 8.35 Million TPA and WHRB - 36 MW] located at Village: Amli, Tehsil: Pindwara, District: Sirohi (Rajasthan) by M/s. UltraTech Nathdwara Cement Limited (Unit: Nathdwara Cement Works) |
|---|---|
| Status | Environmental approval granted |
| Status since | 11 Jan 2023 |
| Application filed | 11 Jan 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Ultratech Nathdwara Cement LTD. |
| Land area | 568.3 acres (230 ha) |
| Project cost | ₹3,269.4 crore |
| Village / locality | Amli |
| Taluk / tehsil | Pindwara |
| District | Sirohi |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-01243 |
In context
12 applications in Sirohi since January 2022 are in the same category (Industry): 8 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 568.3 acres, this one is larger than 75% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amli, Pindwara, Sirohi, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regarding the Transfer / Name Change in the Environment Clearance granted for… — environmental approval granted, 0 m away
- Regarding Transfer / Name Change in the Environment Clearance granted for… — environmental approval granted, 450 m away
- Residential Township associated with Integrated Cement Plant - Built-up Area:… — under environmental review, 750 m away
- Regarding Transfer / Name Change in the Environment Clearance granted for… — lapsed, 2.5 km away
- Amli Limestone Mine (ML Area – 468.6875 Ha) With Expansion in Limestone… — environmental approval granted, 2.5 km away
- Amli Limestone Mine (ML Area – 468.6875 Ha) With Expansion in Limestone… — cleared for impact study, 2.5 km away
- Regarding Transfer / Name Change in the EC granted for Thandiberi Limestone… — lapsed, 5.4 km away
- Thandiberi Limestone Mine (ML Area – 256.00 ha) With Expansion in Limestone… — cleared for impact study, 5.4 km away
More from Ultratech Nathdwara Cement LTD. in Sirohi
- Thandiberi Limestone Mine (ML Area – 256.00 ha) With Expansion in Limestone… — environmental approval granted
- Amli Limestone Mine (ML Area – 468.6875 Ha) With Expansion in Limestone… — environmental approval granted
- Thandiberi Limestone Mine (ML Area – 256.00 ha) With Expansion in Limestone… — cleared for impact study
- Amli Limestone Mine (ML Area – 468.6875 Ha) With Expansion in Limestone… — cleared for impact study
5 Ultratech Nathdwara Cement projects in Sirohi
All 6 Ultratech Nathdwara Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.