Environmental approval grantedIndustry · Bundi, Rajasthan

Proposed 300 KLPD Grain based Ethanol Plant by M/s. Vidya Green Ventures Private Limited

Proposed 300 KLPD Grain based Ethanol Plant by M/s. Vidya Green Ventures Private Limited is an approved industrial project in Jalodi, Talera, Bundi, Rajasthan. The site covers 22 acres. Its stated project cost is ₹353.1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 3 Jan 2025).

See it on the live map All projects in Bundi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed 300 KLPD Grain based Ethanol Plant by M/s. Vidya Green Ventures Private Limited

Project details

Official titleProposed 300 KLPD Grain based Ethanol Plant along with 6.5 MW Cogeneration Power Plant at Village Jalodi, Tehsil Talera, District Bundi, Rajasthan by M/s. Vidya Green Ventures Private Limited
StatusEnvironmental approval granted
Status since3 Jan 2025
Application filed13 Oct 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantVidya Green Ventures Private Limited
Land area22 acres (8.9 ha)
Project cost₹353.1 crore
Village / localityJalodi
Taluk / tehsilTalera
DistrictBundi
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-01014

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 21 May 2026Environmental approval granted16.8 acres₹353.1 crore
Amendment filed 5 May 2026Withdrawn16.8 acres₹353.1 crore
New project filed 13 Oct 2023 (this page)Environmental approval granted22 acres₹353.1 crore

In context

18 applications in Bundi since January 2022 are in the same category (Industry): 12 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 22 acres, this one is larger than 61% of them.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jalodi, Talera, Bundi, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.