Quick answers
What is this project?
Enhancement in Clinker production capacity from 1.94 MTPA to 2.24 MTPA through process optimization in existing plant of Chittor Cement Plant located at Villages – Bhawaliya & Mangrol, Tehsil - Nimbahera, District – Chittorgarh, Rajasthan by Nuvoco Vistas Corp Ltd is an approved industrial project in Bhavliya, Nimbahera, Chittaurgarh, Rajasthan. The site covers 451.9 acres.
Who is building it?
The applicant is Nuvoco Vistas Corp LTD.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 May 2024), as of 27 Nov 2026.
Where is it?
In Bhavliya, Nimbahera, Chittaurgarh, Rajasthan.
How big is it?
It has a stated cost of ₹2,340 crore and a site of 451.9 acres.
When was it filed?
The application was filed on 6 Jan 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 May 2024 |
| Application filed | 6 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Nuvoco Vistas Corp LTD |
| Land area | 451.9 acres (182.9 ha) |
| Project cost | ₹2,340 crore |
| Village / locality | Bhavliya |
| Taluk / tehsil | Nimbahera |
| District | Chittaurgarh |
| State | Rajasthan |
| Location from | Site area on record |
| Our reference | WID-RJ-02183 |
In context
26 applications in Chittaurgarh since January 2022 are in the same category (Industry): 10 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 451.9 acres, this one is larger than 54% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhavliya, Nimbahera, Chittaurgarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Cement Production Capacity of Existing Integrated Cement Plant… — initial checks, 150 m away
- Expansion of Integrated Cement Plant - Clinker (2.24 Million TPA to 5.24… — cleared for impact study, 150 m away
- Proposed Production of Lc3 Cement to the Tune of 0. 12 Million Tpa in Existing… — initial checks, 1.8 km away
- Name Change in earlier granted EC from M/s Lafarge India Pvt. Ltd. to M/s… — environmental approval granted, 2.2 km away
- Mangrol Lime Stone Mines (22/1995) — lapsed, 3.2 km away
- limestone (chipps) — lapsed, 3.2 km away
- Name Change in earlier granted EC from M/s Lafarge India Pvt. Ltd. to M/s… — environmental approval granted, 3.8 km away
- Shambhupura Limestone Deposit Mine (ML No. 05/1992, ML Area: 725.1813 ha) with… — under environmental review, 4.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.