What is Developing? Open the mapMap

Under environmental reviewMining · Chittaurgarh, Rajasthan

Shambhupura Limestone Deposit Mine (ML No. 05/1992, ML Area: 725.1813 ha) with Limestone Production Capacity: 7.685 Million TPA, Top Soil: 0.021 Million TPA and Waste (Overburden): 1.476 Million TPA; (Total Excavation: 9.182 Million TPA)

Shambhupura Limestone Deposit Mine (ML No. 05/1992, ML Area: 725.1813 ha) with Limestone Production Capacity: 7.685 Million TPA, Top Soil: 0.021 Million TPA and Waste (Overburden): 1.476 Million TPA; (Total Excavation: 9.182 Million TPA) is a proposed mining project in Ramakhera, Nimbahera, Chittaurgarh, Rajasthan. The site covers 1,792 acres. Its stated project cost is ₹320 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 11 Jun 2026).

See it on the live map All projects in Chittaurgarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Shambhupura Limestone Deposit Mine (ML No. 05/1992, ML Area: 725.1813 ha) with Limestone Production Capacity: 7.685 Million TPA, Top Soil: 0.021 Million TPA and Waste (Overburden): 1.476 Million TPA; (Total Excavation: 9.182 Million TPA) is a proposed mining project in Ramakhera, Nimbahera, Chittaurgarh, Rajasthan. The site covers 1,792 acres.

Who is building it?

The applicant is Orient Cement Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Ramakhera, Nimbahera, Chittaurgarh, Rajasthan.

How big is it?

It has a stated cost of ₹320 crore and a site of 1,792 acres.

When was it filed?

The application was filed on 13 Apr 2026.

Project details

Official titleShambhupura Limestone Deposit Mine (ML No. 05/1992, ML Area: 725.1813 ha) with Limestone Production Capacity: 7.685 Million TPA, Top Soil: 0.021 Million TPA and Waste (Overburden): 1.476 Million TPA; (Total Excavation: 9.182 Million TPA) along with installation of 1800 TPH Capacity Crusher located at Villages: Myra, Bamniya & Thikariya in Tehsil: Chittorgarh and Villages: Unkhiliya, Fatcher Solanki, Satkhanda, Rampura & Bhujiakhedi in Tehsil: Nimbahera, District: Chittorgarh, State: Rajasthan
StatusUnder environmental review
Status since11 Jun 2026
Application filed13 Apr 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantOrient Cement Limited
Land area1,792 acres (725.2 ha)
Project cost₹320 crore
Village / localityRamakhera
Taluk / tehsilNimbahera
DistrictChittaurgarh
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-31996

In context

2,142 applications in Chittaurgarh since January 2022 are in the same category (Mining): 1,206 approved, 59 filed or under review, and 877 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 1,792 acres, this one is larger than 99% of them.

No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.

Where it is

Ramakhera, Nimbahera, Chittaurgarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Orient Cement Limited in Chittaurgarh

3 Orient Cement projects in Chittaurgarh
All 11 Orient Cement projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.