Quick answers
What is this project?
Proposed Masonry Stone Mining Lease (M.L. No. 40/2021, Area-1.00 ha) at khasra no. 4497, near Village- Nikumbh, Tehsil- Badi Sadri, District- Chittorgarh (Rajasthan) is a lapsed mining project in Nikumbh, Bari Sadri, Chittaurgarh, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Badri Jat.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Nikumbh, Bari Sadri, Chittaurgarh, Rajasthan.
How big is it?
It has a stated cost of ₹50 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 29 Feb 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 29 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Badri Jat |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Nikumbh |
| Taluk / tehsil | Bari Sadri |
| District | Chittaurgarh |
| State | Rajasthan |
| Location from | Site area on record |
| Our reference | WID-RJ-06283 |
In context
2,142 applications in Chittaurgarh since January 2022 are in the same category (Mining): 1,206 approved, 59 filed or under review, and 877 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 2.5 acres, this one is smaller than 58% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 24.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 64 mining leases have applied within 5 km.
Where it is
Nikumbh, Bari Sadri, Chittaurgarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Masonry Stone Mining Lease (M.L. No. 22/2021, Area-1.00 ha) at khasra… — lapsed, 50 m away
- Reappraisal of Earlier Granted EC By DEIAA, Chittorgarh (Raj.) Vide Letter… — lapsed, 350 m away
- Proposed Enhancement in Existing Production Capacity from 33650 TPA (ROM) to… — lapsed, 350 m away
- Proposed Enhancement in Existing Production Capacity from 33650 TPA (ROM) to… — cleared for impact study, 350 m away
- Transfer of Environmental Clearance (from Late Shri Ajit Kumar Chhingawat S/o… — lapsed, 750 m away
- Reappraisal of Earlier Granted EC By DEIAA, Chittorgrh (Raj.) Vide Letter No.… — environmental approval granted, 750 m away
- Reappraisal of Earlier Granted EC By DEIAA, Chittorgrh (Raj.) Vide Letter No.… — withdrawn, 750 m away
- Nikumbha China clay & Quartz Mine — environmental approval granted, 850 m away
More from Badri Jat in Chittaurgarh
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.