Quick answers
What is this project?
Proposed Enhancement in Existing Production Capacity from 33650 TPA (ROM) to 378456 TPA (ROM) and inclusion of mineral Quartzite in existing China Clay Mineral Mining Project , M.L.No. 56/2010, Area- 4.022 Ha. (Govt. Land) , Khasra No.- 4497, Near Village- Nikumbh, Tehsil- Badi Sadri Dist.- Chittorgarh(Raj.) of applicant M/s Shree Vardhman Minerals is a lapsed mining project in Nikumbh, Bari Sadri, Chittaurgarh, Rajasthan. The site covers 9.9 acres.
Who is building it?
The applicant is Shri Vardhman Minerals.
Has it been approved?
No. The application was lapsed on 7 Aug 2026, so it is no longer under consideration.
Where is it?
In Nikumbh, Bari Sadri, Chittaurgarh, Rajasthan.
How big is it?
It has a stated cost of ₹2.5 crore and a site of 9.9 acres.
When was it filed?
The application was filed on 12 May 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Enhancement in Existing Production Capacity from 33650 TPA (ROM) to 378456 TPA…
Project details
| Status | Lapsed |
|---|---|
| Status since | 7 Aug 2026 |
| Application filed | 12 May 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Shri Vardhman Minerals |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹2.5 crore |
| Village / locality | Nikumbh |
| Taluk / tehsil | Bari Sadri |
| District | Chittaurgarh |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-31920 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 12 May 2025 (this page) | Lapsed | 9.9 acres | ₹2.5 crore |
| Early planning filed 29 Sept 2023 | Cleared for impact study | 9.9 acres | ₹2.5 crore |
In context
2,142 applications in Chittaurgarh since January 2022 are in the same category (Mining): 1,206 approved, 59 filed or under review, and 877 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 9.9 acres, this one is larger than 58% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 51.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 59 mining leases have applied within 5 km.
Where it is
Nikumbh, Bari Sadri, Chittaurgarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Reappraisal of Earlier Granted EC By DEIAA, Chittorgarh (Raj.) Vide Letter… — lapsed, 0 m away
- Proposed Enhancement in Existing Production Capacity from 33650 TPA (ROM) to… — cleared for impact study, 0 m away
- Proposed Masonry Stone Mining Lease (M.L. No. 40/2021, Area-1.00 ha) at khasra… — lapsed, 350 m away
- Proposed Masonry Stone Mining Lease (M.L. No. 22/2021, Area-1.00 ha) at khasra… — lapsed, 400 m away
- Transfer of Environmental Clearance (from Late Shri Ajit Kumar Chhingawat S/o… — lapsed, 450 m away
- Reappraisal of Earlier Granted EC By DEIAA, Chittorgrh (Raj.) Vide Letter No.… — environmental approval granted, 450 m away
- Reappraisal of Earlier Granted EC By DEIAA, Chittorgrh (Raj.) Vide Letter No.… — withdrawn, 450 m away
- Nikumbha China clay & Quartz Mine — environmental approval granted, 600 m away
More from Shri Vardhman Minerals in Chittaurgarh
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.