"Quartz & Feldspar Mining Project, M.L. No: 5A/1981 (15/2001)" is a lapsed mining project in Ballupura, Raipur, Pali, Rajasthan. The site covers 63.5 acres.
Who is building it?
The applicant is Bhawani Nath.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Ballupura, Raipur, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹2 crore and a site of 63.5 acres.
When was it filed?
The application was filed on 1 Mar 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 1 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Bhawani Nath |
| Land area | 63.5 acres (25.7 ha) |
| Project cost | ₹2 crore |
| Village / locality | Ballupura |
| Taluk / tehsil | Raipur |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-08665 |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 63.5 acres, this one is larger than 89% of them.
No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.
Where it is
Ballupura, Raipur, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/S Lithos Minerals , Quartz Feldspar, Soapstone & Marble Mining Project (Ml… — under environmental review, 0 m away
- M/S Lithos Minerals , Quartz Feldspar, Soapstone & Marble Mining Project (Ml… — environmental approval granted, 0 m away
- M/S Lithos Minerals , Quartz Feldspar, Soapstone & Marble Mining Project (Ml… — cleared for impact study, 0 m away
- Re-appraisal of earlier granted EC by DEIAA Pali (Raj.)vide latter no.… — lapsed, 750 m away
- Inclusion of Masonry Stone in Existing Limestone Mining Project M.L.NO… — lapsed, 1.5 km away
- Proposed Mineral Inclusion of Masonry Stone in Existing Limestone Mining… — withdrawn, 1.5 km away
- Re-appraisal of Environmental Clearance granted by DEIAA, Pali of our Existing… — lapsed, 1.9 km away
- Limestone and mineral inclusion of Masonry Stone in Mining Lease (M.L. No. –… — lapsed, 4.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.