Quick answers
What is this project?
Inclusion of Masonry Stone in Existing Limestone Mining Project M.L.NO 03/1995, Area -4.60 Hectare Near Village Khangar Khet, Tehsil Raipur District Beawar in favour of M/s Dhartiputra Mines Prop Smt. Sangita Sharma is a lapsed mining project in Kanuja, Raipur, Pali, Rajasthan. The site covers 11.4 acres.
Who is building it?
The applicant is Sangeeta Sharma.
Has it been approved?
No. The application was lapsed on 4 Jul 2025, so it is no longer under consideration.
Where is it?
In Kanuja, Raipur, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹1.7 crore and a site of 11.4 acres.
When was it filed?
The application was filed on 4 Jul 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 4 Jul 2025 |
| Application filed | 4 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sangeeta Sharma |
| Land area | 11.4 acres (4.6 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Kanuja |
| Taluk / tehsil | Raipur |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-34508 |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.4 acres, this one is larger than 80% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 23.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 24 mining leases have applied within 5 km.
Where it is
Kanuja, Raipur, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Mineral Inclusion of Masonry Stone in Existing Limestone Mining… — withdrawn, 0 m away
- Re-appraisal of Environmental Clearance granted by DEIAA, Pali of our Existing… — lapsed, 400 m away
- Re-appraisal of earlier granted EC by DEIAA Pali (Raj.)vide latter no.… — lapsed, 800 m away
- M/S Lithos Minerals , Quartz Feldspar, Soapstone & Marble Mining Project (Ml… — under environmental review, 1.5 km away
- M/S Lithos Minerals , Quartz Feldspar, Soapstone & Marble Mining Project (Ml… — environmental approval granted, 1.5 km away
- M/S Lithos Minerals , Quartz Feldspar, Soapstone & Marble Mining Project (Ml… — cleared for impact study, 1.5 km away
- "Quartz & Feldspar Mining Project, M.L. No: 5A/1981 (15/2001)" — lapsed, 1.5 km away
- Limestone and mineral inclusion of Masonry Stone in Mining Lease (M.L. No. –… — lapsed, 3.2 km away
More from Sangeeta Sharma in Pali
- Proposed Mineral Inclusion of Masonry Stone in Existing Limestone Mining… — withdrawn
- Re-appraisal of Environmental Clearance granted by DEIAA, Pali of our Existing… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.