What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Jaipur, Rajasthan

Industrial Shed for the proposed Cables and Conductor Wires manufacturing coming up at DTA-002-008 to 014 (DTA-I), Mahindra World City, Village Kalwara, Tehsil Sanganer, Jaipur (Raj)

Industrial Shed for the proposed Cables and Conductor Wires manufacturing coming up at DTA-002-008 to 014 (DTA-I), Mahindra World City, Village Kalwara, Tehsil Sanganer, Jaipur (Raj) is an approved industrial building project in Kalwara, Sanganer, Jaipur, Rajasthan. It plans 7 towers of up to 5 floors on 13.6 acres. Its stated project cost is ₹354.3 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 13 Jan 2025).

See it on the live map All projects in Jaipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleConstruction of Industrial Shed for the proposed Cables and Conductor Wires manufacturing coming up at DTA-002-008 to 014 (DTA-I), Mahindra World City, Village Kalwara, Tehsil Sanganer, Jaipur (Raj)
StatusEnvironmental approval granted
Status since13 Jan 2025
Application filed23 Nov 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantOswal cableS Private Limited
UseIndustrial
Towers7
Floors (tallest)5
Height14 m
Parking spaces562
Land area13.6 acres (5.5 ha)
Built-up area37,431 m² (4,02,904 sq ft)
Plot area55,197 m² (5,94,135 sq ft)
Project cost₹354.3 crore
Village / localityKalwara
Taluk / tehsilSanganer
DistrictJaipur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-08734

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 18 Feb 2025Withdrawn13.6 acres₹354.3 crore
New project filed 23 Nov 2024 (this page)Environmental approval granted13.6 acres₹354.3 crore

In context

284 applications in Jaipur since January 2022 are in the same category (Buildings & townships): 196 approved, 45 filed or under review, and 42 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 13.6 acres, this one is larger than 71% of them.

18 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kalwara, Sanganer, Jaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Oswal cableS projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.