Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 31 Dec 2025 |
| Application filed | 18 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Safari Manufacturing Limited |
| Use | Industrial |
| Parking spaces | 473 |
| Land area | 15.5 acres (6.3 ha) |
| Built-up area | 41,871 m² (4,50,695 sq ft) |
| Plot area | 62,659 m² (6,74,455 sq ft) |
| Project cost | ₹215 crore |
| Village / locality | Kalwara |
| Taluk / tehsil | Sanganer |
| District | Jaipur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-08946 |
In context
284 applications in Jaipur since January 2022 are in the same category (Buildings & townships): 196 approved, 45 filed or under review, and 42 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 15.5 acres, this one is larger than 75% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalwara, Sanganer, Jaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Name change/Transfer of Environmental clearance issued to M/s Oswal Cables… — under environmental review, 250 m away
- Industrial Shed for the proposed Cables and Conductor Wires manufacturing… — withdrawn, 250 m away
- Industrial Shed for the proposed Cables and Conductor Wires manufacturing… — environmental approval granted, 250 m away
- Proposed Expansion of "Jaipur Medical College & Hospital, Village Kalwara,… — environmental approval granted, 1.4 km away
- Proposed Industrial shed of Indo Autotech Limited — under environmental review, 1.9 km away
- Bhartiya Skill Development University — environmental approval granted, 2 km away
- Expansion of Existing Manufacturing facility for JCB India ltd. located at… — under environmental review, 2.6 km away
- Proposed Expansion of Existing Hospital and Medical College "Arya Medical… — under environmental review, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.