What is this project?
Re Appraisal of EC Granted from DEIAA Bikaner to SEIAA Rajasthan for "Gypsum(Minor Mineral) Mining Project"(M.L.No-33/2013)for proposed production Capacity of 78866TPA(ROM) is a lapsed mining project in 17 Lkd, Khajuwala, Bikaner, Rajasthan. The site covers 11.1 acres.
Who is building it?
The applicant is Basti Ram Bishnoi.
Has it been approved?
No. The application was lapsed on 21 Jul 2025, so it is no longer under consideration.
Where is it?
In 17 Lkd, Khajuwala, Bikaner, Rajasthan.
How big is it?
It has a stated cost of ₹25 lakh and a site of 11.1 acres.
When was it filed?
The application was filed on 11 Jun 2024.
Project details
| Official title | Re Appraisal of EC Granted from DEIAA Bikaner to SEIAA Rajasthan for "Gypsum(Minor Mineral) Mining Project"(M.L.No-33/2013)for proposed production Capacity of 78866TPA(ROM) Located at Near Village Seventeen LKD, Tehsil- Chhattargarh,,District-Bikaner(Rajasthan) by Shri Bastiram Bishnoi S/o Shri Ram Swaroop Bishnoi as per MoEF&CC OM Dated 28.04.2023. |
|---|---|
| Status | Lapsed |
| Status since | 21 Jul 2025 |
| Application filed | 11 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Basti Ram Bishnoi |
| Land area | 11.1 acres (4.5 ha) |
| Project cost | ₹25 lakh |
| Village / locality | 17 Lkd |
| Taluk / tehsil | Khajuwala |
| District | Bikaner |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-09137 |
In context
516 applications in Bikaner since January 2022 are in the same category (Mining): 270 approved, 60 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 11.1 acres, this one is larger than 59% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
17 Lkd, Khajuwala, Bikaner, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Water Supply Project including Reorganisation & Improvement of various… — more information requested, 13.4 km away
- "Construction of LILO of 132kV S/C Transmission Line from Pugal RD-710 to… — more information requested, 31.9 km away
- 132 kV S/C overhead Transmission Line on ACSR Panther conductor by M/s… — lapsed, 32.2 km away
- "Construction of 33 kV D/C Transmission Line from M/s G.V. Renewable Energy… — lapsed, 35.9 km away
- Construction for Water Pumping Station, Tank, Pipeline & Underground 11 KV… — forest land use approved, 36.7 km away
- "Construction of 220 kV S/C overhead Transmission Line by M/s Martial Solren… — forest land use approved, 36.7 km away
- "Re Appraisal of EC granted from DEIAA, Bikaner of Existing Gypusm (Minor… — lapsed, 38.5 km away
- Re Appraisal of EC Granted from DEIAA, Bikaner, of "Gypsum (Minor Mineral)… — lapsed, 44.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.