Construction for Water Pumping Station, Tank, Pipeline & Underground 11 KV Transmission Cable, from IGNP to NTPC Solar Power Project at Chhattargarh, District -Bikaner (Rajasthan)"

Construction for Water Pumping Station, Tank, Pipeline & Underground 11 KV Transmission Cable, from IGNP to NTPC Solar Power Project at Chhattargarh, District -Bikaner (Rajasthan)" is an approved power project in 1 Chm, Chhatargarh, Bikaner, Rajasthan. The site covers 653 acres. Its stated project cost is ₹1 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 16 Apr 2026).

See it on the live map All projects in Bikaner

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Construction for Water Pumping Station, Tank, Pipeline & Underground 11 KV Transmission Cable, from IGNP to NTPC Solar Power Project at Chhattargarh, District -Bikaner (Rajasthan)" is an approved power project in 1 Chm, Chhatargarh, Bikaner, Rajasthan. The site covers 653 acres.

Who is building it?

The applicant is NTPC Limited (NTPC).

Has it been approved?

Yes. Its status is “Forest land use approved” (since 16 Apr 2026), as of 27 Nov 2026.

Where is it?

In 1 Chm, Chhatargarh, Bikaner, Rajasthan.

How big is it?

It has a stated cost of ₹1 crore; a site of 653 acres and 490 m² of forest land.

When was it filed?

The application was filed on 9 Oct 2023.

Project details

StatusForest land use approved
Status since16 Apr 2026
Application filed9 Oct 2023
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantNTPC Limited (NTPC)
Land area653 acres (264.2 ha)
Forest land490 m²
Project cost₹1 crore
Village / locality1 Chm
Taluk / tehsilChhatargarh
DistrictBikaner
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-36457

In context

20 applications in Bikaner since January 2022 are in the same category (Power): 8 approved, 7 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 653 acres, this one is smaller than 61% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

1 Chm, Chhatargarh, Bikaner, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.