Quick answers
What is this project?
Leela Patidar Masonarystone & Sandstone Mine Project M.L. No 48/2004 is a lapsed mining project in Durgpura, Jhalrapatan, Jhalawar, Rajasthan. The site covers 2.6 acres.
Who is building it?
The applicant is Leela Patidar.
Has it been approved?
No. The application was lapsed on 20 Apr 2025, so it is no longer under consideration.
Where is it?
In Durgpura, Jhalrapatan, Jhalawar, Rajasthan.
How big is it?
It has a stated cost of ₹15 lakh and a site of 2.6 acres.
When was it filed?
The application was filed on 22 Dec 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Apr 2025 |
| Application filed | 22 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Leela Patidar |
| Land area | 2.6 acres (1.1 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Durgpura |
| Taluk / tehsil | Jhalrapatan |
| District | Jhalawar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-09163 |
In context
140 applications in Jhalawar since January 2022 are in the same category (Mining): 91 approved, 22 filed or under review, and 27 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.6 acres, this one is smaller than 71% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Durgpura, Jhalrapatan, Jhalawar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Kalisindh Power Project: An 800 MW Expansion in Jhalawar (14.3 km away).
Other projects nearby
- Construction of Road Nala to Kotda — under forest review, 450 m away
- Construction of Approach Road to Prempura Laxmipura — more information requested, 2 km away
- Construction of Approach Road to Nolav — decision issued, 2.4 km away
- Biloniya Sandstone (Building Stone) Mine — under environmental review, 2.7 km away
- Wedening & strengthening from Single lane to double lane of Jhalrapatan Gindor… — lapsed, 3.1 km away
- Construction of Road Bawdikhera to Fazalpura — more information requested, 3.2 km away
- Laying of Treated Waste Water Pipeline From Sewerage Treatment Plant to… — more information requested, 3.7 km away
- Jhalrapatan Town & 104 Village Water Supply Project From Rajagarh Dam — more information requested, 3.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.