Quick answers
What is this project?
Existing Masonry Stone Mining Project; M.L No.- 16/2014, Area: 1.0 Hect. Near Village :- Daruda, Tehsil & District:- Barmer (Raj.) from Late Shri Padam Singh S/o Late Shri Rygh Singh To Shri Dasrath Singh S/o Late Shri Padam Singh is a lapsed mining project in Darura, Barmer, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Dasrath Singh.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Darura, Barmer, Rajasthan.
How big is it?
It has a stated cost of ₹35 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 12 Mar 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 12 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Dasrath Singh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Darura |
| Taluk / tehsil | Barmer |
| District | Barmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-09428 |
In context
878 applications in Barmer since January 2022 are in the same category (Mining): 465 approved, 100 filed or under review, and 313 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 2.5 acres, this one is smaller than 97% of them.
No other mining lease on record is within 500 m of this site; 40 have applied within 5 km.
Where it is
Darura, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regarding re-appraisal of Environmental Clearance granted by DEIAA, Barmer… — environmental approval granted, 0 m away
- Daruda Masonry Stone Mining Project, Plot No. 76, KHASRA NO. 399/299 Plot area… — lapsed, 1.9 km away
- Regarding re-appraisal of Environmental Clearance granted by DEIAA, Barmer… — environmental approval granted, 1.9 km away
- Daruda Masonry Stone Mining Project, Plot No. 75 Favor of M/s Maa Santoshi… — lapsed, 1.9 km away
- Daruda Masonry Stone Mining Project, Plot No. 75, Proposed Production –… — cleared for impact study, 1.9 km away
- Daruda Masonry Stone Mining Project, Plot No. 75 Favor of M/s Maa Santoshi… — cleared for impact study, 1.9 km away
- Daruda Masonry Stone Mining Project, Plot No. 73 Favor of Shri Arjun Singh,… — lapsed, 2 km away
- Daruda Masonry Stone Mining Project, Plot No. 73 Favor of Shri Arjun Singh,… — cleared for impact study, 2 km away
More from Dasrath Singh in Barmer
- Regarding re-appraisal of Environmental Clearance granted by DEIAA, Barmer… — environmental approval granted
- Regarding Transfer of EC of our Existing Masonry Stone Mining Project; M.L… — lapsed
- Re-appraisal of Environmental Clearance granted by DEIAA, Barmer [Rajasthan]… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.