Quick answers
What is this project?
Shri Budh Singh. Sandstone (Minor Mineral) Mining Project with Production Capacity 1,06,730 TPA (ROM) (Sandstone- 71,346 TPA & Waste—35,384 TPA}, Plot No.-49, Area- 1.00 Ha., Khasra no. 543 and Total Cluster Area 17.0 Ha., Production Capacity 20,78,364 TPA is a lapsed mining project in Kasti, Baori, Jodhpur, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is SH. Budh Singh.
Has it been approved?
No. The application was lapsed on 23 Aug 2025, so it is no longer under consideration.
Where is it?
In Kasti, Baori, Jodhpur, Rajasthan.
How big is it?
It has a stated cost of ₹50 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 23 Aug 2024.
Project details
| Official title | Shri Budh Singh. Sandstone (Minor Mineral) Mining Project with Production Capacity 1,06,730 TPA (ROM) (Sandstone- 71,346 TPA & Waste—35,384 TPA}, Plot No.-49, Area- 1.00 Ha., Khasra no. 543 and Total Cluster Area 17.0 Ha., Production Capacity 20,78,364 TPA, Located at Near Village- Kasti, Tehsil– Baori & Distt.–Jodhpur (Rajasthan) |
|---|---|
| Status | Lapsed |
| Status since | 23 Aug 2025 |
| Application filed | 23 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | SH. Budh Singh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Kasti |
| Taluk / tehsil | Baori |
| District | Jodhpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-12138 |
In context
11,954 applications in Jodhpur since January 2022 are in the same category (Mining): 4,406 approved, 210 filed or under review, and 7,338 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 2.5 acres, this one is larger than 90% of them.
32 other mining leases have applied within 500 m of this site; together with this one they cover 81.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 174 mining leases have applied within 5 km.
Where it is
Kasti, Baori, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sandstone (Minor Mineral) Mining Project, Plot No.-49, Area- 1.00 Ha. with… — lapsed, 0 m away
- Sandstone (Minor Mineral) Mining Project with Production Capacity 1,69,065 TPA… — more information requested, 100 m away
- Sandstone (Minor Mineral) Mining Project Plot No.-48, Area- 1.00 Ha., Khasra… — lapsed, 100 m away
- Sandstone (Minor Mineral) Mining Project with Production Capacity 1,69,065 TPA… — returned to applicant, 100 m away
- Proposed Project of Sand Stone Mining Project (ML Area 1.00 ha and Plot No.-… — lapsed, 100 m away
- Shri Rameshwar Lal Ostwal, Sandstone (Minor Mineral) Mining Project with… — more information requested, 100 m away
- Shri Kishor Gwala, Sandstone (Minor Mineral) Mining Project with Production… — more information requested, 100 m away
- Shri Kishor Gwala, Sandstone (Minor Mineral) Mining Project with Production… — lapsed, 100 m away
More from SH. Budh Singh in Jodhpur
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.