What is this project?
Sandstone (Minor Mineral) Mining Project with Production Capacity 1,69,065 TPA (ROM) (Sandstone- 1,01,439 TPA & Waste—67,626 TPA}, Plot No.-48, Area- 1.00 Ha., Khasra no. 543 and Total Cluster Area 17.0 Ha., Production Capacity 20,78,364 TPA by Shri Satyanarayan Prajapat is a proposed mining project in Kasti, Baori, Jodhpur, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Satayanaryan Prajapat.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Kasti, Baori, Jodhpur, Rajasthan.
How big is it?
It has a stated cost of ₹50 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 23 Aug 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sandstone (Minor Mineral) Mining Project with Production Capacity 1,69,065 TPA (ROM)…
Project details
| Official title | Sandstone (Minor Mineral) Mining Project with Production Capacity 1,69,065 TPA (ROM) (Sandstone- 1,01,439 TPA & Waste—67,626 TPA}, Plot No.-48, Area- 1.00 Ha., Khasra no. 543 and Total Cluster Area 17.0 Ha., Production Capacity 20,78,364 TPA, Located at Near Village- Kasti, Tehsil– Baori & Distt.–Jodhpur (Rajasthan) by Shri Satyanarayan Prajapat |
|---|---|
| Status | Returned to applicant |
| Status since | 3 Jun 2025 |
| Application filed | 23 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Satayanaryan Prajapat |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Kasti |
| Taluk / tehsil | Baori |
| District | Jodhpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-03666 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Feb 2026 | More information requested | 2.5 acres | ₹50 lakh |
| New project filed 23 Aug 2024 (this page) | Returned to applicant | 2.5 acres | ₹50 lakh |
In context
11,954 applications in Jodhpur since January 2022 are in the same category (Mining): 4,406 approved, 210 filed or under review, and 7,338 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 2.5 acres, this one is larger than 90% of them.
38 other mining leases have applied within 500 m of this site; together with this one they cover 96.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 174 mining leases have applied within 5 km.
Where it is
Kasti, Baori, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sandstone (Minor Mineral) Mining Project with Production Capacity 1,69,065 TPA… — more information requested, 0 m away
- Sandstone (Minor Mineral) Mining Project Plot No.-48, Area- 1.00 Ha., Khasra… — lapsed, 0 m away
- Sandstone (Minor Mineral) Mining Project, Plot No.-49, Area- 1.00 Ha. with… — lapsed, 100 m away
- Shri Budh Singh. Sandstone (Minor Mineral) Mining Project with Production… — lapsed, 100 m away
- Shri Kishor Gwala, Sandstone (Minor Mineral) Mining Project with Production… — more information requested, 100 m away
- Shri Kishor Gwala, Sandstone (Minor Mineral) Mining Project with Production… — lapsed, 100 m away
- Shri Kishor Gwala, Sandstone (Minor Mineral) Mining Project with Production… — returned to applicant, 100 m away
- Existing Sandstone Mining Project, Delineated Plot. No.-42, Area- 1.00 Ha.… — under environmental review, 150 m away
More from Satayanaryan Prajapat in Jodhpur
- Sandstone (Minor Mineral) Mining Project with Production Capacity 2,36,925 TPA… — under environmental review
- Sandstone (Minor Mineral) Mining Project with Production Capacity 1,69,065 TPA… — more information requested
- Sandstone (Minor Mineral) Mining Project Plot No.-48, Area- 1.00 Ha., Khasra… — lapsed
- Sandstone (Minor Mineral) Mining Project with Production Capacity 2,36,925 TPA… — lapsed
- Sandstone (Minor Mineral) Mining Project Plot No.-64, Area- 1.00 Ha., Khasra… — lapsed
- Sandstone (Minor Mineral) Mining Project with Production Capacity 1,69,065 TPA… — returned to applicant
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.