What is Developing? Open the mapMap

LapsedMining · Pali, Rajasthan

EC for Expansion in Production Capacity for "Kerpura Quartz & Feldspar Mine, M.L. No. 151/2013 (Old ML No. 24/2009), Khasra No.: 1730, 1785"

EC for Expansion in Production Capacity for "Kerpura Quartz & Feldspar Mine, M.L. No. 151/2013 (Old ML No. 24/2009), Khasra No.: 1730, 1785" is a lapsed mining project in Sumel, Raipur, Pali, Rajasthan. The site covers 11.5 acres. Its stated project cost is ₹1 crore. As of 27 Nov 2026, its status is “Lapsed” (since 31 Oct 2025).

See it on the live map All projects in Pali

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

EC for Expansion in Production Capacity for "Kerpura Quartz & Feldspar Mine, M.L. No. 151/2013 (Old ML No. 24/2009), Khasra No.: 1730, 1785" is a lapsed mining project in Sumel, Raipur, Pali, Rajasthan. The site covers 11.5 acres.

Who is building it?

The applicant is Purshottam Goyal.

Has it been approved?

No. The application was lapsed on 31 Oct 2025, so it is no longer under consideration.

Where is it?

In Sumel, Raipur, Pali, Rajasthan.

How big is it?

It has a stated cost of ₹1 crore and a site of 11.5 acres.

When was it filed?

The application was filed on 19 Mar 2024.

Project details

Official titleEC for Expansion in Production Capacity for "Kerpura Quartz & Feldspar Mine, M.L. No. 151/2013 (Old ML No. 24/2009), Khasra No.: 1730, 1785" at Village: Kesarpura, Tehsil –Raipur, District: Beawar, Rajasthan, Lease Area: 4.6598 hectare, in favor M/s Maruti Mines and Minerals for proposed production of 106697 TPA ROM (91227 Tones Feldspar + 10136 Tones Quartz + 5334 Tones Waste/OB) from existing capacity of 23396 TPA ROM of mineral Quartz & Feldspar.
StatusLapsed
Status since31 Oct 2025
Application filed19 Mar 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantPurshottam Goyal
Land area11.5 acres (4.7 ha)
Project cost₹1 crore
Village / localitySumel
Taluk / tehsilRaipur
DistrictPali
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-12223

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 19 Mar 2024 (this page)Lapsed11.5 acres₹1 crore
Expansion filed 6 Mar 2024Withdrawn11.5 acres₹1 crore

In context

1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.5 acres, this one is larger than 80% of them.

No other mining lease on record is within 500 m of this site; 31 have applied within 5 km.

Where it is

Sumel, Raipur, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Purshottam Goyal in Pali

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.