Quick answers
What is this project?
EC for Expansion in Production Capacity for "Kerpura Quartz & Feldspar Mine, M.L. No. 151/2013 (Old ML No. 24/2009), Khasra No.: 1730, 1785" is a withdrawn mining project in Sumel, Raipur, Pali, Rajasthan. The site covers 11.5 acres.
Who is building it?
The applicant is Purshottam Goyal.
Has it been approved?
No. The application was withdrawn on 18 Jun 2026, so it is no longer under consideration.
Where is it?
In Sumel, Raipur, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹1 crore and a site of 11.5 acres.
When was it filed?
The application was filed on 6 Mar 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: EC for Expansion in Production Capacity for "Kerpura Quartz & Feldspar Mine, M.L. No.…
Project details
| Official title | EC for Expansion in Production Capacity for "Kerpura Quartz & Feldspar Mine, M.L. No. 151/2013 (Old ML No. 24/2009), Khasra No.: 1730, 1785" at Village: Kesarpura, Tehsil –Raipur, District: Beawar, Rajasthan, Lease Area: 4.6598 hectare, in favor M/s Maruti Mines and Minerals for proposed production of 106697 TPA ROM (91227 Tones Feldspar + 10136 Tones Quartz + 5334 Tones Waste/OB) from existing capacity of 23396 TPA ROM of mineral Quartz & Feldspar. |
|---|---|
| Status | Withdrawn |
| Status since | 18 Jun 2026 |
| Application filed | 6 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Purshottam Goyal |
| Land area | 11.5 acres (4.7 ha) |
| Project cost | ₹1 crore |
| Village / locality | Sumel |
| Taluk / tehsil | Raipur |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-17800 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Mar 2024 | Lapsed | 11.5 acres | ₹1 crore |
| Expansion filed 6 Mar 2024 (this page) | Withdrawn | 11.5 acres | ₹1 crore |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.5 acres, this one is larger than 80% of them.
No other mining lease on record is within 500 m of this site; 31 have applied within 5 km.
Where it is
Sumel, Raipur, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-appraisal of EC issued by DEIAA for Kerpura Quartz & Feldspar Mine, M.L.… — environmental approval granted, 0 m away
- EC for Expansion in Production Capacity for "Kerpura Quartz & Feldspar Mine,… — lapsed, 0 m away
- Reappraisal of the EC granted by DEIAA Pali for Quartz and Feldspar Mining… — environmental approval granted, 2.2 km away
- EC Transfer of Existing Quartz, Feldspar, Calcite, Soapstone & Redochre Mining… — lapsed, 2.3 km away
- Re-appraisal of earlier granted EC by DEIAA Pali (Raj.)vide latter no.… — lapsed, 2.5 km away
- Sodpura - Rampura Wollastonite, Calcite, Quartz & Feldspar Mine, M.L. NO.:… — lapsed, 3.1 km away
- Sodpura - Rampura Wollastonite, Calcite, Quartz & Feldspar Mine, M.L. NO.:… — environmental approval granted, 3.1 km away
- Shri Bishal Anand, Quartz & Feldspar area Plot No. 207, Near village - Sumel,… — lapsed, 3.3 km away
More from Purshottam Goyal in Pali
- Re-appraisal of EC issued by DEIAA for Kerpura Quartz & Feldspar Mine, M.L.… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.