One of 2 filings for this project. The project's main page, with every filing and where each stands: Industrial project by M/S Shri Gulab Agri Products
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 11 Mar 2025 |
| Application filed | 25 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Satya Narayan Agarwal |
| Land area | 3,000 m² |
| Project cost | ₹2.8 crore |
| Village / locality | Wasnimafi |
| Taluk / tehsil | Mavli |
| District | Udaipur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-12336 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 17 Jun 2025 | Environmental approval granted | 0.7 acres | ₹2.8 crore |
| Early planning filed 25 Dec 2024 (this page) | Cleared for impact study | 0.7 acres | ₹2.8 crore |
In context
38 applications in Udaipur since January 2022 are in the same category (Industry): 27 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.7 acres, this one is smaller than 87% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Wasnimafi, Mavli, Udaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/S Shri Gulab Agri Products — environmental approval granted, 0 m away
- Proposed Synthetic Organic Chemicals manufacturing unit of Unsaturated… — environmental approval granted, 4.9 km away
- Proposed Synthetic Organic Chemicals manufacturing unit of Unsaturated… — cleared for impact study, 4.9 km away
- Project by Rotam Crop protection Pvt. Ltd. — initial checks, 5 km away
- Proposed Expansion Project For Manufacturing Of Drugs and Their Intermediates… — lapsed, 5.1 km away
- Macsen Labs Limited Unit 3 — more information requested, 5.2 km away
- "Expansion of Fertilizer Manufacturing Plant" at Plot No. G1-29 to G-39 &… — environmental approval granted, 5.3 km away
- "Expansion of Fertilizer Manufacturing Plant" at Plot No. G1-29 to G-39 &… — cleared for impact study, 5.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.