Quick answers
What is this project?
Design, construction, establishment and development of Processing Plant & Engineered Sanitary Landfill Site of Solid Waste at Jaisalmer by SHRI BALAJI CARETAKER is a proposed waste management project in Amarsagar, Jaisalmer, Rajasthan. The site covers 80 acres.
Who is building it?
The applicant is Raj Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 15 Sept 2024), as of 27 Nov 2026.
Where is it?
In Amarsagar, Jaisalmer, Rajasthan.
How big is it?
It has a stated cost of ₹7.4 crore and a site of 80 acres.
When was it filed?
The application was filed on 28 Aug 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 15 Sept 2024 |
| Application filed | 28 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Raj Singh |
| Land area | 80 acres (32.4 ha) |
| Project cost | ₹7.4 crore |
| Village / locality | Amarsagar |
| Taluk / tehsil | Jaisalmer |
| District | Jaisalmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-14117 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Jun 2025 | Lapsed | 80 acres | ₹7.4 crore |
| Early planning filed 28 Aug 2024 (this page) | Cleared for impact study | 80 acres | ₹7.4 crore |
In context
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amarsagar, Jaisalmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Design, construction, establishment and development of Processing Plant &… — lapsed, 0 m away
- Design, construction, establishment and development of Processing Plant and… — cleared for impact study, 0 m away
- Limestone (Flooring) Mine — environmental approval granted, 200 m away
- Limestone (Flooring )mine, M.L. No. 458/2002, Area-1.00 Hetare for… — lapsed, 1.2 km away
- Re Appraisal of EC Granted from DEIAA, Jaisalmer, of "Lime Stone (Minor… — lapsed, 1.3 km away
- Re-appraisal of Environmental Clearance granted by DEIAA, Jaisalmer (Raj.)… — environmental approval granted, 1.5 km away
- Existing "Masonry Stone Mining Project has been transferring via Murlidhar… — lapsed, 1.5 km away
- Re Appraisal of EC Granted from DEIAA, of "Lime Stone Flooring (Minor Mineral)… — lapsed, 1.5 km away
More from Raj Singh in Jaisalmer
- Design, construction, establishment and development of Processing Plant and… — cleared for impact study