Quick answers
What is this project?
Design, construction, establishment and development of Processing Plant & Engineered Sanitary Landfill Site of Solid Waste at Jaisalmer by SHRI BALAJI CARETAKER is a lapsed waste management project in Amarsagar, Jaisalmer, Rajasthan. The site covers 80 acres.
Who is building it?
The applicant is Raj Singh.
Has it been approved?
No. The application was lapsed on 22 Feb 2026, so it is no longer under consideration.
Where is it?
In Amarsagar, Jaisalmer, Rajasthan.
How big is it?
It has a stated cost of ₹7.4 crore and a site of 80 acres.
When was it filed?
The application was filed on 13 Jun 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Design, construction, establishment and development of Processing Plant & Engineered…
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Feb 2026 |
| Application filed | 13 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Waste management |
| Applicant | Raj Singh |
| Land area | 80 acres (32.4 ha) |
| Project cost | ₹7.4 crore |
| Village / locality | Amarsagar |
| Taluk / tehsil | Jaisalmer |
| District | Jaisalmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-25546 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Jun 2025 (this page) | Lapsed | 80 acres | ₹7.4 crore |
| Early planning filed 28 Aug 2024 | Cleared for impact study | 80 acres | ₹7.4 crore |
In context
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amarsagar, Jaisalmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Design, construction, establishment and development of Processing Plant &… — cleared for impact study, 0 m away
- Design, construction, establishment and development of Processing Plant and… — cleared for impact study, 0 m away
- Limestone (Flooring) Mine — environmental approval granted, 200 m away
- Limestone (Flooring )mine, M.L. No. 458/2002, Area-1.00 Hetare for… — lapsed, 1.2 km away
- Re Appraisal of EC Granted from DEIAA, Jaisalmer, of "Lime Stone (Minor… — lapsed, 1.3 km away
- Re-appraisal of Environmental Clearance granted by DEIAA, Jaisalmer (Raj.)… — environmental approval granted, 1.5 km away
- Existing "Masonry Stone Mining Project has been transferring via Murlidhar… — lapsed, 1.5 km away
- Re Appraisal of EC Granted from DEIAA, of "Lime Stone Flooring (Minor Mineral)… — lapsed, 1.5 km away
More from Raj Singh in Jaisalmer
- Design, construction, establishment and development of Processing Plant and… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.