What is Developing? Open the mapMap

Cleared for impact studyMining · Ajmer, Rajasthan

Proposed Bajri/River Sand Mining project "Plot No. 02, ML No.-16/2025, over an area – 10.9467 Hectare with proposed Production capacity – 98520.4 TPA (ROM) { Mineral Bajri- 78816 TPA, & waste – 19704.4 TPA} by Applicant Sh. Datar Singh S/o Sh. Hanuman Singh

Proposed Bajri/River Sand Mining project "Plot No. 02, ML No.-16/2025, over an area – 10.9467 Hectare with proposed Production capacity – 98520.4 TPA (ROM) { Mineral Bajri- 78816 TPA, & waste – 19704.4 TPA} by Applicant Sh. Datar Singh S/o Sh. Hanuman Singh is a proposed mining project in Devliakalan, Bhinay, Ajmer, Rajasthan. The site covers 27.1 acres. Its stated project cost is ₹9 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Nov 2025).

See it on the live map All projects in Ajmer

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Bajri/River Sand Mining project "Plot No. 02, ML No.-16/2025, over an area – 10.9467 Hectare with proposed Production capacity – 98520.4 TPA (ROM) { Mineral Bajri- 78816 TPA, & waste – 19704.4 TPA} by Applicant Sh. Datar Singh S/o Sh. Hanuman Singh is a proposed mining project in Devliakalan, Bhinay, Ajmer, Rajasthan. The site covers 27.1 acres.

Who is building it?

The applicant is Datar Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 17 Nov 2025), as of 27 Nov 2026.

Where is it?

In Devliakalan, Bhinay, Ajmer, Rajasthan.

How big is it?

It has a stated cost of ₹9 lakh and a site of 27.1 acres.

When was it filed?

The application was filed on 13 Nov 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Bajri/River Sand Mining project "Plot No. 02, ML No.-16/2025, over an area –…

Project details

Official titleProposed Bajri/River Sand Mining project "Plot No. 02, ML No.-16/2025, over an area – 10.9467 Hectare with proposed Production capacity – 98520.4 TPA (ROM) { Mineral Bajri- 78816 TPA, & waste – 19704.4 TPA}, located at Khasra No.- 1754 Near Village -Devliya Kalan, Tehsil– Bhinay, District – Ajmer (Rajasthan) by Applicant Sh. Datar Singh S/o Sh. Hanuman Singh .
StatusCleared for impact study
Status since17 Nov 2025
Application filed13 Nov 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantDatar Singh
Land area27.1 acres (11 ha)
Project cost₹9 lakh
Village / localityDevliakalan
Taluk / tehsilBhinay
DistrictAjmer
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-20286

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 5 Jan 2026Cleared for impact study27.1 acres₹50 lakh
Early planning filed 13 Nov 2025 (this page)Cleared for impact study27.1 acres₹9 lakh

In context

1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 27.1 acres, this one is larger than 96% of them.

No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.

Where it is

Devliakalan, Bhinay, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Datar Singh in Ajmer

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.