Quick answers
What is this project?
Proposed Bajri/River Sand Mining project "Plot No. 07, ML No.-20/2025, over an area – 41.0375 Hectare with proposed Production capacity – 3,69,337.6 TPA (ROM) {Bajri/River Sand - 2,95,470 TPA, & waste – 73,867.6 TPA}, located at Khasra No.- 2571 & 2572 Near Village -Badli, Tehsil– Bhinay, District – Ajmer (Rajasthan) by Applicant Sh. Datar Singh S/o Sh. Hanuman Singh is a proposed mining project in Barli, Bhinay, Ajmer, Rajasthan. The site covers 101.4 acres.
Who is building it?
The applicant is Datar Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 17 Nov 2025), as of 27 Nov 2026.
Where is it?
In Barli, Bhinay, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹38 lakh and a site of 101.4 acres.
When was it filed?
The application was filed on 13 Nov 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Bajri/River Sand Mining project "Plot No. 07, ML No.-20/2025, over an area –…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 17 Nov 2025 |
| Application filed | 13 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Datar Singh |
| Land area | 101.4 acres (41 ha) |
| Project cost | ₹38 lakh |
| Village / locality | Barli |
| Taluk / tehsil | Bhinay |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-27136 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 5 Jan 2026 | Cleared for impact study | 101.4 acres | ₹38 lakh |
| Early planning filed 13 Nov 2025 (this page) | Cleared for impact study | 101.4 acres | ₹38 lakh |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 101.4 acres, this one is larger than 98% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Barli, Bhinay, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Bajri/River Sand Mining project "Plot No. 07, ML No.-20/2025, over an… — cleared for impact study, 0 m away
- Proposed Bajri/River Sand Mining project "Plot No. 08, ML No.-21/2025, over an… — cleared for impact study, 2.2 km away
- Proposed Bajri/River Sand Mining project "Plot No. 08, ML No.-21/2025, over an… — cleared for impact study, 2.2 km away
- Bajri Mining Project, Plot No 09, ML No 22/2025" having mine lease area… — cleared for impact study, 2.9 km away
- "Reappraisal of the EC granted by DEIAA Ajmer for Masonry Stone Mining… — environmental approval granted, 3 km away
- Reappraisal of the EC granted by DEIAA Ajmer for Masonry Stone Mining Project,… — environmental approval granted, 3.1 km away
- Re-Appraisal of EC Granted from DEIAA Ajmer to SEIAA Rajasthan, for "Quartz &… — lapsed, 3.9 km away
- M/S SYMPHONIA AND GRAPHICUS PVT. LTD., Plot No.– BJ-14, Bajri (River Sand)… — lapsed, 4.2 km away
More from Datar Singh in Ajmer
- Proposed Bajri/River Sand Mining project "Plot No. 02, ML No.-16/2025, over an… — cleared for impact study
- Proposed Bajri/River Sand Mining project "Plot No. 02, ML No.-16/2025, over an… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.