Quick answers
What is this project?
Proposed "Nimbol Limestone Mine Block - NB 07" for capacity of 12,50,000 Tones/Year Limestone production and 2,33,595 Tones/Year waste (including inter burden, over burden and soil) with total Excavation: 14,83,595 Tones/Year, in the Mining Lease Area of 14.3246 Ha by Star Cement North East Limited is a proposed mining project in Nimbol, Jaitaran, Pali, Rajasthan. The site covers 35.4 acres.
Who is building it?
The applicant is Star Cement North East Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 27 Nov 2025), as of 27 Nov 2026.
Where is it?
In Nimbol, Jaitaran, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹20.2 crore and a site of 35.4 acres.
When was it filed?
The application was filed on 27 Nov 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed "Nimbol Limestone Mine Block - NB 07" for capacity of 12,50,000 Tones/Year…
Project details
| Official title | Proposed "Nimbol Limestone Mine Block - NB 07" for capacity of 12,50,000 Tones/Year Limestone production and 2,33,595 Tones/Year waste (including inter burden, over burden and soil) with total Excavation: 14,83,595 Tones/Year, in the Mining Lease Area of 14.3246 Ha. at Village Nimbol, Tehsil - Jaitaran, District – Beawar (Rajasthan) by Star Cement North East Limited. |
|---|---|
| Status | Cleared for impact study |
| Status since | 27 Nov 2025 |
| Application filed | 27 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Star Cement North East Limited |
| Land area | 35.4 acres (14.3 ha) |
| Project cost | ₹20.2 crore |
| Village / locality | Nimbol |
| Taluk / tehsil | Jaitaran |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-20536 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Aug 2026 | Environmental approval granted | 35.4 acres | ₹20.2 crore |
| Early planning filed 27 Nov 2025 (this page) | Cleared for impact study | 35.4 acres | ₹20.2 crore |
| Early planning filed 19 Nov 2025 | Cleared for impact study | 35.4 acres | ₹20.2 crore |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 35.4 acres, this one is larger than 87% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 118.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 33 mining leases have applied within 5 km.
Where it is
Nimbol, Jaitaran, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Nimbol Limestone Mine Block - NB 07" for capacity of 12,50,000… — environmental approval granted, 0 m away
- Proposed "Nimbol Limestone Mine Block - NB 07" for capacity of 12,50,000… — cleared for impact study, 0 m away
- Nimbol Bogasani Limestone Block (Block No.: NB-10, Lease Code: PB203, Khasra… — lapsed, 200 m away
- Nimbol Bogasani Limestone Block (Block No.: NB-10, Lease Code: PB203, Khasra… — cleared for impact study, 200 m away
- "Nimbol Limestone Mine Block - NB 08" for capacity of 8,50,000 Tones/Year… — environmental approval granted, 350 m away
- "Nimbol Limestone Mine Block - NB 08" for capacity of 8,50,000 Tones/Year… — cleared for impact study, 350 m away
- "Nimbol Limestone Mine Block - NB 06" for capacity of 8,50,000 Tones/Year… — environmental approval granted, 400 m away
- "Nimbol Limestone Mine Block - NB 06" for capacity of 8,50,000 Tones/Year… — cleared for impact study, 400 m away
More from Star Cement North East Limited in Pali
- Integrated Cement Plant with production capacity of Clinker - 8.0 Million TPA… — under environmental review
- "Nimbol Limestone Mine Block - NB 06" for capacity of 8,50,000 Tones/Year… — environmental approval granted
- "Nimbol Limestone Mine Block - NB 11" for capacity of 8,50,000 Tones/Year… — environmental approval granted
- "Nimbol Limestone Mine Block - NB 08" for capacity of 8,50,000 Tones/Year… — environmental approval granted
- "Nimbol Limestone Mine Block - NB 05" for capacity of 8,50,000 Tones/Year… — environmental approval granted
- Proposed "Nimbol Limestone Mine, Block- NB 04", for capacity of 12,00,000… — environmental approval granted
19 Star Cement North East projects in Pali
All 24 Star Cement North East projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.