Quick answers
What is this project?
Nimbol Bogasani Limestone Block (Block No.: NB-10, Lease Code: PB203, Khasra No.: 23, 16/1, 18/3, 22, 22/1, 22/3, 23/1, 24, 26/1) is a lapsed mining project in Nimbol, Jaitaran, Pali, Rajasthan. The site covers 10 acres.
Who is building it?
The applicant is Mahendra Singh.
Has it been approved?
No. The application was lapsed on 13 Sept 2026, so it is no longer under consideration.
Where is it?
In Nimbol, Jaitaran, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹2 crore and a site of 10 acres.
When was it filed?
The application was filed on 13 Aug 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Nimbol Bogasani Limestone Block (Block No.: NB-10, Lease Code: PB203, Khasra No.: 23,…
Project details
| Official title | Nimbol Bogasani Limestone Block (Block No.: NB-10, Lease Code: PB203, Khasra No.: 23, 16/1, 18/3, 22, 22/1, 22/3, 23/1, 24, 26/1) at Village- Nimbol, Tehsil- Jaitaran, District- Beawar, State- Rajasthan, Block Area: 4.0547 Hects. in favor of M/s Ambika Suppliers |
|---|---|
| Status | Lapsed |
| Status since | 13 Sept 2026 |
| Application filed | 13 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mahendra Singh |
| Land area | 10 acres (4.1 ha) |
| Project cost | ₹2 crore |
| Village / locality | Nimbol |
| Taluk / tehsil | Jaitaran |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-33285 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Aug 2026 (this page) | Lapsed | 10 acres | ₹2 crore |
| Early planning filed 25 Sept 2025 | Cleared for impact study | 10 acres | ₹2 crore |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 10 acres, this one is larger than 76% of them.
7 other mining leases have applied within 500 m of this site; together with this one they cover 178.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 33 mining leases have applied within 5 km.
Where it is
Nimbol, Jaitaran, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nimbol Bogasani Limestone Block (Block No.: NB-10, Lease Code: PB203, Khasra… — cleared for impact study, 0 m away
- Proposed "Nimbol Limestone Mine Block - NB 07" for capacity of 12,50,000… — environmental approval granted, 200 m away
- Proposed "Nimbol Limestone Mine Block - NB 07" for capacity of 12,50,000… — cleared for impact study, 200 m away
- Proposed "Nimbol Limestone Mine Block - NB 07" for capacity of 12,50,000… — cleared for impact study, 200 m away
- "Nimbol Limestone Mine Block - NB 06" for capacity of 8,50,000 Tones/Year… — environmental approval granted, 200 m away
- "Nimbol Limestone Mine Block - NB 06" for capacity of 8,50,000 Tones/Year… — cleared for impact study, 200 m away
- Nimbol Limestone Mine Block - NB 06" for capacity of 8,50,000 Tones/Year… — cleared for impact study, 200 m away
- "Nimbol Limestone Mine Block - NB 05" for capacity of 8,50,000 Tones/Year… — environmental approval granted, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.