What is Developing? Open the mapMap

Cleared for impact studyMining · Tonk, Rajasthan

River Sand (Bajri) Mining Project (Minor Mineral), Plot No.-04, Mining Lease/Plot Area- 73.61 Ha., Located at Near Revenue Villages- Satwara, Tehsil- Devli, District- Tonk, Rajasthan. Proposed Production Capacity-2649960 TPA (ROM) {Saleable Mineral-2649960 TPA & Waste- Nil, TPA} proposed by M/s Daleep Lime Udyog

River Sand (Bajri) Mining Project (Minor Mineral), Plot No.-04, Mining Lease/Plot Area- 73.61 Ha., Located at Near Revenue Villages- Satwara, Tehsil- Devli, District- Tonk, Rajasthan. Proposed Production Capacity-2649960 TPA (ROM) {Saleable Mineral-2649960 TPA & Waste- Nil, TPA} proposed by M/s Daleep Lime Udyog is a proposed mining project in Benera, Todaraisingh, Tonk, Rajasthan. The site covers 181.9 acres. Its stated project cost is ₹9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 13 Aug 2025).

See it on the live map All projects in Tonk

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

River Sand (Bajri) Mining Project (Minor Mineral), Plot No.-04, Mining Lease/Plot Area- 73.61 Ha., Located at Near Revenue Villages- Satwara, Tehsil- Devli, District- Tonk, Rajasthan. Proposed Production Capacity-2649960 TPA (ROM) {Saleable Mineral-2649960 TPA & Waste- Nil, TPA} proposed by M/s Daleep Lime Udyog is a proposed mining project in Benera, Todaraisingh, Tonk, Rajasthan. The site covers 181.9 acres.

Who is building it?

The applicant is Jora Ram.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 13 Aug 2025), as of 27 Nov 2026.

Where is it?

In Benera, Todaraisingh, Tonk, Rajasthan.

How big is it?

It has a stated cost of ₹9 crore and a site of 181.9 acres.

When was it filed?

The application was filed on 12 Aug 2025.

Project details

StatusCleared for impact study
Status since13 Aug 2025
Application filed12 Aug 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantJora Ram
Land area181.9 acres (73.6 ha)
Project cost₹9 crore
Village / localityBenera
Taluk / tehsilTodaraisingh
DistrictTonk
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-21048

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 16 Jan 2026Lapsed181.9 acres₹9 crore
Early planning filed 12 Aug 2025 (this page)Cleared for impact study181.9 acres₹9 crore

In context

362 applications in Tonk since January 2022 are in the same category (Mining): 227 approved, 30 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 181.9 acres, this one is larger than 91% of them.

No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.

Where it is

Benera, Todaraisingh, Tonk, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jora Ram in Tonk

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.