Quick answers
What is this project?
Proposed Masonry Stone Mining Project, Production capacity 4,80,000 TPA, M.L. No. 1/2023 (Ref. No. 20221000071296), Cluster Area: - 13.6688ha, Applied Lease Area 2.4542 Ha is a lapsed mining project in Bagdiyo Ka Bas, Danta Ramgarh, Sikar, Rajasthan. The site covers 6.1 acres.
Who is building it?
The applicant is Rohitash Kumar.
Has it been approved?
No. The application was lapsed on 12 Jul 2025, so it is no longer under consideration.
Where is it?
In Bagdiyo Ka Bas, Danta Ramgarh, Sikar, Rajasthan.
How big is it?
It has a stated cost of ₹1 crore and a site of 6.1 acres.
When was it filed?
The application was filed on 23 May 2025.
Project details
| Official title | Proposed Masonry Stone Mining Project, Production capacity 4,80,000 TPA, M.L. No. 1/2023 (Ref. No. 20221000071296), Cluster Area: - 13.6688ha, Applied Lease Area 2.4542 Ha. at Located Near Village- Bagadiyon Ka Bas, Tehsil – Danta Ramgarh, District: - Sikar (Rajasthan) in favor of Shri Rohitash Kumar. |
|---|---|
| Status | Lapsed |
| Status since | 12 Jul 2025 |
| Application filed | 23 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Rohitash Kumar |
| Land area | 6.1 acres (2.5 ha) |
| Project cost | ₹1 crore |
| Village / locality | Bagdiyo Ka Bas |
| Taluk / tehsil | Danta Ramgarh |
| District | Sikar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-21688 |
In context
837 applications in Sikar since January 2022 are in the same category (Mining): 470 approved, 62 filed or under review, and 305 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 6.1 acres, this one is larger than 77% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 23.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 54 mining leases have applied within 5 km.
Where it is
Bagdiyo Ka Bas, Danta Ramgarh, Sikar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Masonry Stone Mining Project, Production capacity 4,80,000 TPA M.L.… — cleared for impact study, 0 m away
- Expansion in Production capacity of Bagdiyon Ka Bas ( Samarthpura) Masonry… — lapsed, 50 m away
- EC Reappraisal and Expansion of Bagdiyon Ka Bas ( Samarthpura) Masonry Stone… — returned to applicant, 50 m away
- EC Reappraisal and Expansion of Bagdiyon Ka Bas ( Samarthpura) Masonry Stone… — environmental approval granted, 50 m away
- EC Reappraisal and Expansion of Bagdiyon Ka Bas ( Samarthpura) Masonry Stone… — lapsed, 50 m away
- Expansion in Production capacity of Bagdiyon Ka Bas ( Samarthpura) Masonry… — lapsed, 150 m away
- EC Reappraisal and Expansion of Bagdiyon Ka Bas ( Samarthpura) Masonry Stone… — returned to applicant, 150 m away
- EC Reappraisal and Expansion of Bagdiyon Ka Bas ( Samarthpura) Masonry Stone… — environmental approval granted, 150 m away
More from Rohitash Kumar in Sikar
- Proposed Masonry Stone Mining Project, Production capacity 4,80,000 TPA M.L.… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.