Cleared for impact studyMining · Sikar, Rajasthan

Proposed Masonry Stone Mining Project, Production capacity 4,80,000 TPA M.L. No. 1/2023 (Ref. No. 20221000071296), Cluster Area: - 13.6692ha, Applied Lease Area 2.4542 Ha

Proposed Masonry Stone Mining Project, Production capacity 4,80,000 TPA M.L. No. 1/2023 (Ref. No. 20221000071296), Cluster Area: - 13.6692ha, Applied Lease Area 2.4542 Ha is a proposed mining project in Bagadiyon Ka Bas, Danta Ramgarh, Sikar, Rajasthan. The site covers 6.1 acres. Its stated project cost is ₹1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 1 Jul 2025).

See it on the live map All projects in Sikar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Masonry Stone Mining Project, Production capacity 4,80,000 TPA M.L. No. 1/2023 (Ref. No. 20221000071296), Cluster Area: - 13.6692ha, Applied Lease Area 2.4542 Ha is a proposed mining project in Bagadiyon Ka Bas, Danta Ramgarh, Sikar, Rajasthan. The site covers 6.1 acres.

Who is building it?

The applicant is Rohitash Kumar.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 1 Jul 2025), as of 27 Nov 2026.

Where is it?

In Bagadiyon Ka Bas, Danta Ramgarh, Sikar, Rajasthan.

How big is it?

It has a stated cost of ₹1 crore and a site of 6.1 acres.

When was it filed?

The application was filed on 9 Jun 2025.

Project details

Official titleProposed Masonry Stone Mining Project, Production capacity 4,80,000 TPA M.L. No. 1/2023 (Ref. No. 20221000071296), Cluster Area: - 13.6692ha, Applied Lease Area 2.4542 Ha. at Located Near Village- Bagadiyon Ka Bas, Tehsil – Danta Ramgarh, District: - Sikar (Rajasthan) in favor of Shri Rohitash Kumar.
StatusCleared for impact study
Status since1 Jul 2025
Application filed9 Jun 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantRohitash Kumar
Land area6.1 acres (2.5 ha)
Project cost₹1 crore
Village / localityBagadiyon Ka Bas
Taluk / tehsilDanta Ramgarh
DistrictSikar
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-24372

In context

837 applications in Sikar since January 2022 are in the same category (Mining): 470 approved, 62 filed or under review, and 305 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 6.1 acres, this one is larger than 77% of them.

5 other mining leases have applied within 500 m of this site; together with this one they cover 23.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 54 mining leases have applied within 5 km.

Where it is

Bagadiyon Ka Bas, Danta Ramgarh, Sikar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.