Quick answers
What is this project?
Re-Appraisal of EC Granted from DEIAA SAWAI MADHOPUR to SEIAA, for Existing MASONARY STONE (minor mineral) mining project" [M.L.No.-79/2010] over an Area of 1.0 Hectare with Existing Production Capacity–150000 TPA by SH. SATYA NARAYAN MEENA is a lapsed mining project in Bhedoli, Bonli, Sawai Madhopur, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Satya NARAYAN MEENA.
Has it been approved?
No. The application was lapsed on 9 Aug 2026, so it is no longer under consideration.
Where is it?
In Bhedoli, Bonli, Sawai Madhopur, Rajasthan.
How big is it?
It has a stated cost of ₹30 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 1 Feb 2025.
Project details
| Official title | Re-Appraisal of EC Granted from DEIAA SAWAI MADHOPUR to SEIAA, for Existing MASONARY STONE (minor mineral) mining project" [M.L.No.-79/2010] over an Area of 1.0 Hectare with Existing Production Capacity–150000 TPA located at Near Village–Bhedoli, Tehsil-Bonli & District-SAWAIMADHOPUR (Raj.) by SH. SATYA NARAYAN MEENA |
|---|---|
| Status | Lapsed |
| Status since | 9 Aug 2026 |
| Application filed | 1 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Satya NARAYAN MEENA |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Bhedoli |
| Taluk / tehsil | Bonli |
| District | Sawai Madhopur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-21953 |
In context
235 applications in Sawai Madhopur since January 2022 are in the same category (Mining): 97 approved, 46 filed or under review, and 92 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.5 acres, this one is smaller than 93% of them.
6 other mining leases have applied within 500 m of this site; together with this one they cover 17.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 43 mining leases have applied within 5 km.
Where it is
Bhedoli, Bonli, Sawai Madhopur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Masonry Stone (Minor Mineral) Mining Project, ML No-109/2006, Area-1.0 Ha.,… — lapsed, 100 m away
- Shri Ram Lal Bairwa, M.L.No. 94/2006 — environmental approval granted, 200 m away
- Shri Ram Lal Bairwa, M.L.No. 63/2009 — withdrawn, 200 m away
- Transfer of Earlier Granted EC from Shri Rajveer Singh to Shri Narpat Singh,… — lapsed, 200 m away
- Reappraisal of DEIAA EC to SEIAA for Masonry Stone (Minor Mineral) Mining… — lapsed, 350 m away
- Shri Ghanshyam Meena [reappraisal of Ec From Deiaa to Seiaa for Masonry Stone… — environmental approval granted, 400 m away
- Shri Prashant Bairwa M.L.No. 32/2006 — environmental approval granted, 500 m away
- Reappraisal of DEIAA EC to SEIAA for Masonry Stone (Minor Mineral) Mining… — environmental approval granted, 500 m away
More from Satya NARAYAN MEENA in Sawai Madhopur
- Re-Appraisal of EC Granted from DEIAA SWAI MADHOPUR to SEIAA, for Existing… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.