Quick answers
What is this project?
Shri Ghanshyam Meena [reappraisal of Ec From Deiaa to Seiaa for Masonry Stone Mining Project, M.L. No. 33/2006, Area-1.0 Ha, Near Village-Behdoli, Tehsil-Bonli, District-Sawaimadhopur (Rajasthan), Proposed Production Capacity 90000 Tpa (Rom) Vt is an approved mining project in Bhedoli, Bonli, Sawai Madhopur, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Ghanshyam Meena.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Feb 2025), as of 27 Nov 2026.
Where is it?
In Bhedoli, Bonli, Sawai Madhopur, Rajasthan.
How big is it?
It has a stated cost of ₹20 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 18 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Feb 2025 |
| Application filed | 18 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ghanshyam Meena |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Bhedoli |
| Taluk / tehsil | Bonli |
| District | Sawai Madhopur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-30765 |
In context
235 applications in Sawai Madhopur since January 2022 are in the same category (Mining): 97 approved, 46 filed or under review, and 92 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.5 acres, this one is smaller than 93% of them.
7 other mining leases have applied within 500 m of this site; together with this one they cover 19.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 43 mining leases have applied within 5 km.
Where it is
Bhedoli, Bonli, Sawai Madhopur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Prashant Bairwa M.L.No. 32/2006 — environmental approval granted, 100 m away
- Shri Ram Lal Bairwa, M.L.No. 94/2006 — environmental approval granted, 200 m away
- Shri Ram Lal Bairwa, M.L.No. 63/2009 — withdrawn, 200 m away
- Smt. Sushma Bairwa, M.L.No. 34/2006 — environmental approval granted, 200 m away
- Masonry Stone (Minor Mineral) Mining Project, ML No-109/2006, Area-1.0 Ha.,… — lapsed, 300 m away
- Smt. Sushma Bairwa, M.L.No. 35/2006 — environmental approval granted, 300 m away
- Re-Appraisal of EC Granted from DEIAA SAWAI MADHOPUR to SEIAA, for Existing… — lapsed, 400 m away
- Transfer of Earlier Granted EC from Shri Rajveer Singh to Shri Narpat Singh,… — lapsed, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.