Quick answers
What is this project?
Proposed River Sand (Bajri) Mining Project, Delineation Plot No.BJRJD-14, Area 23.1768Ha. (Govt. land), Near Village- Jhak, Tehsil- Bilara, Dist.- Jodhpur (Raj.) of Applicant Shri Kuldeep Choudhary S/o Shri Narendra Choudhary is a proposed mining project in Jhak, Bilara, Jodhpur, Rajasthan. The site covers 57.3 acres.
Who is building it?
The applicant is Kuldeep Narendra Choudhary.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 27 May 2025), as of 27 Nov 2026.
Where is it?
In Jhak, Bilara, Jodhpur, Rajasthan.
How big is it?
It has a stated cost of ₹9 crore and a site of 57.3 acres.
When was it filed?
The application was filed on 16 May 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 27 May 2025 |
| Application filed | 16 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Kuldeep Narendra Choudhary |
| Land area | 57.3 acres (23.2 ha) |
| Project cost | ₹9 crore |
| Village / locality | Jhak |
| Taluk / tehsil | Bilara |
| District | Jodhpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-22056 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 May 2026 | Lapsed | 57.3 acres | ₹9 crore |
| Early planning filed 16 May 2025 (this page) | Cleared for impact study | 57.3 acres | ₹9 crore |
In context
11,954 applications in Jodhpur since January 2022 are in the same category (Mining): 4,406 approved, 210 filed or under review, and 7,338 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 57.3 acres, this one is larger than 99% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Jhak, Bilara, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed River Sand (Bajri) Mining Project, Delineation Plot No.BJRJD-14, Area… — lapsed, 0 m away
- Proposed River Sand (Bajri) Mining Project, Delineation Plot No. BJRJD-11,… — environmental approval granted, 1.1 km away
- Proposed River Sand (Bajri) Mining Project, Delineation Plot No. BJRJD-11,… — cleared for impact study, 1.1 km away
- 933 , Fiduser — lapsed, 3.1 km away
- Environmental Clearance of the green field project for Fully mechanized… — returned to applicant, 4.4 km away
- Integrated Cement Plant with production capacity of Clinker - 4.0 Million TPA,… — withdrawn, 4.9 km away
- Existing Lime Stone Mining Project, M.L. No. 19/1992, Area; -9.0 ha. (Govt.… — environmental approval granted, 5 km away
- Existing Lime Stone Mining Project, M.L. No. 19/1992, Area; -9.0 ha. (Govt.… — cleared for impact study, 5 km away
More from Kuldeep Narendra Choudhary in Jodhpur
- Proposed River Sand (Bajri) Mining Project, Delineated Plot No. BJRJD- 22,… — lapsed
- Proposed River Sand (Bajri) Mining Project, Delineated Plot No. BJRJD- 22,… — cleared for impact study
- Proposed Enhancement in Production Capacity from 2,22,828 TPA to 4,00,188 TPA… — lapsed
- Proposed River Sand (Bajri) Mining Project, Delineation Plot No. BJRJD-11,… — environmental approval granted
- Proposed River Sand (Bajri) Mining Project, Delineation Plot No. BJRJD-11,… — cleared for impact study
- Re-Appraisal of EC Granted from DEIAA Jodhpur to SEIAA Rajasthan Existing… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.