Quick answers
What is this project?
EC Re-appraisal of Existing Lime Stone Mining Lease (M.L. No. – 189/08 & Area: 4.0 Ha) is an approved mining project in Bogasani, Jaitaran, Pali, Rajasthan. The site covers 9.9 acres.
Who is building it?
The applicant is Shree Ram Mines.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Apr 2025), as of 27 Nov 2026.
Where is it?
In Bogasani, Jaitaran, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹1 crore and a site of 9.9 acres.
When was it filed?
The application was filed on 5 Apr 2025.
Project details
| Official title | EC Re-appraisal of Existing Lime Stone Mining Lease (M.L. No. – 189/08 & Area: 4.0 Ha) at Near village-Nimbol, Tehsil- Jaitaran & District- Pali (Rajasthan) of M/s Shree Ram Mines |
|---|---|
| Status | Environmental approval granted |
| Status since | 5 Apr 2025 |
| Application filed | 5 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shree Ram Mines |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹1 crore |
| Village / locality | Bogasani |
| Taluk / tehsil | Jaitaran |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-25609 |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.9 acres, this one is larger than 73% of them.
6 other mining leases have applied within 500 m of this site; together with this one they cover 130.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 34 mining leases have applied within 5 km.
Where it is
Bogasani, Jaitaran, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Limestone Mining Project, Block- NB02" with Proposed Production Capacity- 0.6… — lapsed, 300 m away
- "Limestone Mining Project, Block- NB02" with Proposed Limestone Production… — more information requested, 300 m away
- "Limestone Mining Project, Block- NB02" with Proposed Limestone Production… — cleared for impact study, 300 m away
- "Nimbol Limestone Mine Block - NB 06" for capacity of 8,50,000 Tones/Year… — environmental approval granted, 300 m away
- "Nimbol Limestone Mine Block - NB 06" for capacity of 8,50,000 Tones/Year… — cleared for impact study, 300 m away
- Nimbol Limestone Mine Block - NB 06" for capacity of 8,50,000 Tones/Year… — cleared for impact study, 300 m away
- "Nimbol Limestone Mine Block - NB 11" for capacity of 8,50,000 Tones/Year… — environmental approval granted, 300 m away
- "Nimbol Limestone Mine Block - NB 11" for capacity of 8,50,000 Tones/Year… — cleared for impact study, 300 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.